NI Climbing Frames Trail011 Скачать руководство пользователя страница 1

Trail011 - Wooden Play Balance Adventure Crossing E Instruction Manual 

 

 

 

 

 

 

 

 

 

 

Содержание Trail011

Страница 1: ...Trail011 Wooden Play Balance Adventure Crossing E Instruction Manual ...

Страница 2: ...List Item Number Description Image Quantity 1 3m x 140mm round post uprights 3 2 800mm x 140mm round posts steps 3 3 2400mm x 140mm round post horizontal support 1 4 3m x 140mm round post horizontal support 1 ...

Страница 3: ...5 3m x 3 x 1 5 for bracing if needed 1 6 2 4m x 3 x 1 5 for bracing if needed 1 7 1280mm x 3 x 1 5 for bracing if needed 3 8 2120mm armoured rope with joining ropes chains 1 9 2720mm armoured rope 2 ...

Страница 4: ...10 1500mm drop ropes 3 11 Tyres 3 12 M12 x 280mm bolts 6 13 Screw covers 15 14 Decking screws 30 ...

Страница 5: ...Tools needed Cordless drill Handsaw Spirit Level Pencil Measuring tape PZ 2 Drill Bit 32mm drill bit 12mm drill bit ...

Страница 6: ...umbered with reference to the parts list please refer back to the parts list to ensure you are assembling the correct components for each step Step 1 Dig holes approx 400mm deep and 300mm in diameter for the upright posts to go use the sketch below to position the holes ...

Страница 7: ...extra 3m x 3 x 1 5 and decking screws to brace the posts and keep them straight If holes aren t predrilled you should drill a 32mm hole approx 20mm deep on the top support at each end You should then drill a 12mm hole in the centre of the 32mm hole through the whole post Line up where the bolt will go through each 3m upright and drill a 12mm hole through each post ...

Страница 8: ...sts If these holes aren t predrilled then you should drill 32mm holes 20mm deep and then 12mm holes through the whole posts on each side one at approx 800mm from the bottom of the post and one at approx 1900mm 2300mm from the bottom of the post this depends on how high you want the ropes to be ...

Страница 9: ...ecure the 1 5m drop ropes through the hole predrilled in the 2 4m post If this hasn t been done then you will need to drill 3 x 32mm holes approx 20mm deep on the top support where the tyres are to be placed there should be approx 600mm between the holes You should then drill a 12mm hole in the centre of the 32mm holes through the whole post ...

Страница 10: ...lace it in the hole that has been dug for it Secure the 2 4m post to the two 3m uprights just below the 3m horizontal post Use the 2 4m x 3 x 1 5 as bracing if needed Again you may need to predrill the holes if this hasn t already been done ...

Страница 11: ...Step 7 Drill 12mm holes on the top and bottom of each tyre if this hasn t been done and secure the tyres to the 1500mm drop ropes ...

Страница 12: ...Step 8 Secure the 2 12m armoured rope to the two 3m uprights under the tyres and secure the tyres to it using the joining ropes Again you may need to predrill the holes if this hasn t already been done ...

Страница 13: ...Place the 800mm posts into the holes that have been dug and secure them using M12 bolts to the 3m uprights through the predrilled holes Again you may need to predrill the holes if this hasn t already been done ...

Страница 14: ...w covers into all the 32mm holes and using postcrete and following the manufacturer s instructions concrete all the posts into the ground The frame should be left overnight before it is used to ensure the postcrete has dried ...

Страница 15: ...r used on your climbing frame has been pressure treated This essentially means that it has been put into a pressurised vessel and has been impregnated with wood preserve With time and due exposure to weather conditions the colour fades away We suggest you treat the wood once every 2 years completely optional Not only will this keep it looking lively but will also help it last as long as possible Q...

Отзывы: