![NF WF1946B Скачать руководство пользователя страница 173](http://html1.mh-extra.com/html/nf/wf1946b/wf1946b_instruction-manual_1684910173.webp)
WF1946B
7-3
7.2 Operation checks
Preparatory checks
Check the following before inspection.
z
Power source voltage is within
±
10 % of the rating
z
Ambient temperature is within 5 to 35
°
C.
z
Ambient relative humidity is within 5 to 85 %RH (absolute humidity: 1 to 25 g/m
3
)
z
Condensation is absent.
Function checks
z
Power on
Confirm absence of error message at power on.
If an error message appears,
“6. Troubleshooting”, cf
.
If an abnormal indication appears at power on, switch power off and wait at least 5 seconds, then
again switch power on.
z
Main function checks
To avoid setting error, initialize the settings (
SYSTEM
→
PRESET).
Connect FUNCTION OUT to an oscilloscope with 50
Ω
coaxial cable to monitor the output.
Operate to change the following settings several times and confirm normal functions. Test both
keypad and MODIFY dial for settings such as frequency.
・
Frequency (
ENTRY
→
FREQ
)
・
Amplitude (
ENTRY
→
AMPTD
)
・
DC offset (
ENTRY
→
OFFSET
)
・
Waveform (
FUNCTION
→
,
,
Duty fixed 50 %
,
,
)
・
Duty (
FUNCTION
→
Variable duty
,
ENTRY
→
DUTY
)
・
Output on/off (
C H 2 O U T
O N /O F F
C H 1 O U T
O N /O F F
,
)
Содержание WF1946B
Страница 2: ......
Страница 3: ...DA00012506 002 WF1946B MULTIFUNCTION SYNTHESIZER Instruction Manual ...
Страница 4: ......
Страница 8: ......
Страница 28: ......
Страница 66: ......
Страница 107: ...4 2 Sweep WF1946B 4 41 ...
Страница 164: ......
Страница 180: ......
Страница 198: ......
Страница 200: ......
Страница 202: ......
Страница 203: ......
Страница 204: ...http www nfcorp co jp NF Corporation 6 3 20 Tsunashima higashi Kohoku ku Yokohama 223 8508 JAPAN ...