background image

3

5

4

Installing horizontal brackets

1. On the left side of the frame, position the left L-shape bracket 
between the front and rear sections of the enclosure.

2. Select the mounting height inside the enclosure.

3. Proceed to insert the M6 cage nuts into the selected mounting 
holes of the rail. 

4. Align the oval perforation of the L-bracket (shorter side) with the 
square mounting holes on the rail and secure it using the supplied 
M6x12 screws and the M6 cage nuts.

5. Repeat steps 1 through 4 for installing the right side.

L-shaped bracket (2)

M6x12 screws (4)

M6 cage nuts (4)

16

17

7

Rear panel
1. Align the back panel tab with the slot on the bottom frame. 

Rear panel

Mounting bracket

8

9

3. Make sure to place the left vertical rails in their upright position, 
having the rack unit numbers shown from high (top) to low (bottom). 

4. In addition, the row of numbers on each vertical rail must be facing 
each other on the front and rear sections of the assembly.  

5. To secure the left vertical rail to the enclosure, insert the supplied 
M5 self-tapping screws in the corresponding mounting holes on the 
frame.  

Note: make sure not to fully-tighen the first screw (front and rear 
sections) until the second screw on the vertical rail has been inserted. 
When done, proceed to firmly tighten both screws in every fastening 
point.

6. Repeat steps from 1 through 5 in order to install the right vertical 
rails. 

Vertical right rails (2)

M5x8mm self-tapping screws (8)

20

11

Vertical rails installation 
1. Position the left vertical rails between the front and rear frames.

2. Align the mouning holes of the left vertical rails with the mounting 
holes located on the top and bottom of the frame assembly, as per 
the image below. 

Note: the position of the mounting holes must match  the ones on 
the top and bottom to avoid misalignment.

Frame assembly

Vertical left rails (2)

10

Содержание NPC-F12U64B

Страница 1: ...ProfessionalSeries Semi knocked down fixed wall mount enclosure NPC F12U64B NPC F15U64B NPC F18U64B NPC F12U66B NPC F15U66B NPC F18U66B NPC F9U64B NPC F6U64B NPC F6U66B NPC F9U66B...

Страница 2: ...ents or modifications 1 Introduction Thank you for purchasing the semi knocked down SKD fixed wallmount enclosure from Nexxt Solutions Our wallmount unit is housed in a lockable heavy gauge metal encl...

Страница 3: ...nts Upon opening the box inspect the contents to ensure that all the items listed below are included 1 Phillips screwdriver 2 Power drill with the following bits Phillips head tip 3 Combination wrench...

Страница 4: ...r 15U and 18U Grounding wire User manual 16 16 4 4 18 1 8 1 12 24 3 sets 1 4 Assembly procedure recommended The illustration provides an exploded view of all the enclosure components you are about to...

Страница 5: ...the frame to the top panel using the M8x12 hexagon screws and nuts as shown in the image below Bottom panel subassembly Top cover with fan assembly M8x12 hexagon screws 8 14 1 5 The frame assembly has...

Страница 6: ...4 In addition the row of numbers on each vertical rail must be facing each other on the front and rear sections of the assembly 5 To secure the left vertical rail to the enclosure insert the supplied...

Страница 7: ...nce of the bottom panel 3 Next pull down the spring lock located on the upper right section of the door and release it into the hinge hole in the enclosure 4 Use the keys to test the locking mechanism...

Страница 8: ...am 4 Connect the grounding cable to the left side panel on the rear section of the cabinet 5 Using the self tapping screw bind the grounding cable to the closest mounting hole on the left side horizon...

Страница 9: ......

Отзывы: