24
Cable
Route and connect all cables.
NU to CU cabling.
(Recommended) Connect CUs in order, CU1, CU2, etc.
(Recommended) Best practices to leave a service loop in the cable, for more flexibility with
mounting location. QUATRA CU connections are lossless, so there is no penalty for excess
cable (<100m).
Note
: Do not power up system at this point.
Up to four (4) NUs may be daisy-chained
.
Note
: Systems continue to operate during software updates but may not be visible on the portal
during the update process (usually for 30 minutes within the first 24 hours of operation).
Please leave the systems connected to the Internet for at least 24 hours.