4.1  Trouble analyzing  

The key to troubleshooting is to separate trouble from the system. By analyzing what 
system should do and what system is doing, troubleshooting becomes easy. Think of 
the following systems while analyzing troubles:   

z

 

Power and cooling system—Power and cooling fan;   

z

 

Ports, cables and connections—ports on the front panel of the switch and cables 
connected to the ports.   

4.1.1   Power and cooling system breakdown  

Examine the following conditions to separate troubles:   

z

 

The power is “ON”. Make sure the cooling fan is working normally. If cooling fan is 
not working normally, check the fan;   

z

 

Examine the environment. The switch cannot be overheated. Make sue the inhale 
and exhale hole of the switch is clean. Refer to “General Requirement for Working 
Environment”. The temperature of the switch working environment is 0-40

 

(32-104 

º

F

).  

z

 

If switch is not working and “PWR” indicator is not light, check the power supply.   

4.1.2      Ports, cables and connections breakdown   

To separate problems, check the follow status:   

z

 

If switch port is unable to link, check the connection. Make sure the connection is 
normal;  

z

 

If the power is “ON”, check the power supply and power cord;   

z

 

If the system is working but the console port is not, make sure the console port 
configurations are as follows: 9600 baud rate, 8-bit data bit, no parity bit, 1 stop bit 
and no flow control.   

4.2  LEDs  

LEDs indicates what switches are doing. NH-3730-24F switch LED and functions are 
as follows: 

NO.  

Name  

Description  

Note  

1   

PWR   

Power indicator lights   

Switch on and indicator lights.   

2  

SYS  

System Indicator  

Indicator lights when the system is turning 
on. Indicator blinks when the system is 
functioning. 

 

3  

LINK/ACT

 

Indicator for corresponding 
port. 

Indicator lights when link status is normal. 
Indicator blinks when data is being sent or 
received    

- 11 - 

Содержание NH-3730-24F

Страница 1: ...NH 3730 24F Hardware Installation Manual...

Страница 2: ...ation 6 2 2 3 Configuring Equipment rack 6 2 2 4 Power supply condition 6 Chapter 3 Switch Installation 7 3 1 Installation tools and devices 7 3 2 Switch Case Installation 7 3 2 1 Install on the desk...

Страница 3: ...SFP interfaces for 10 100 1000M auto sense cable application in front of the NH 3730 24F switch 1 10000M expansion slot in back of the chassis a grounding bar in the rear and a power supply plug and a...

Страница 4: ...arameters Table of NH 3730 24F Switch property parameters Standard IEEE 802 1d Spanning Tree Protocol IEEE 802 1p Class of Service IEEE 802 1q tagged VLAN IEEE 802 3x Flow control IEEE 802 3ad Link ag...

Страница 5: ...emperature H umidity for working 0 60 10 85 without air conditioning Temperature H umidity for storage 40 80 5 95 without air conditioning Power supply Input AC100 240V Input frequency 47 63Hz Input c...

Страница 6: ...qualified mechanics are allowed to install or replace the switch z Before working on a chassis or working near power supplies unplug the power cord on AC units disconnect the power at the circuit bre...

Страница 7: ...nents are improperly handled and can result in complete or intermittent failures Always follow electrostatic discharge prevention procedures when removing and replacing components Ensure that the chas...

Страница 8: ...ormation will help you plan an acceptable equipment rack configuration z The equipment in the rack will heat when working So enclosed racks must have adequate ventilation The equipment should not be p...

Страница 9: ...screws z ethernet Cable z other Ethernet terminal devices z console terminal 3 2 Switch Case Installation Switches can be place on the table mounting or other surfaces To install your network correctl...

Страница 10: ...rminal software such as Windows super terminal to configure and monitor operations Cable is provided with host Terminal parallel communication parameters can be set as baud rate 9600bps 8 bit data 1 s...

Страница 11: ...nal terminal One end is RJ45 8 pin plug The other end are 9 hole DB9 plugs RJ45 connecter plugs into NH 3730 24F switch console port The side of the cable is shown as follows The product No of this ca...

Страница 12: ...no are the same Refer to the following chart 10 100 1000Base TX port and other Ethernet terminal connection is shown as follows UTP port explaination is shown as follows Pin NO Description Name 1 Dat...

Страница 13: ...nvironment The temperature of the switch working environment is 0 40 32 104 F z If switch is not working and PWR indicator is not light check the power supply 4 1 2 Ports cables and connections breakd...

Страница 14: ...river z Electrostatic discharge pretective wrist strap Opening the Switch top as the following steps 1 Close the power switch press the switch to OFF side 2 Disconnect all cables from the rear panel o...

Страница 15: ...chassis of the Switch on a desktop or in a rack 6 Connect all cables after completing all work 5 3 System memorizer upgrade 5 3 1 SDRAM Installing method If you need disassemble or assemble caused bec...

Страница 16: ...above 4 Insert the new SDRAM bar by sliding the the end with the metal fingers into the SDRAM connector socket at approximately a 90 angle to the system card Gentely rock the SDRAM bar into place unt...

Отзывы: