![Next GENOA 845525 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/next/genoa-845525/genoa-845525_assembly-instructions-manual_1683442004.webp)
1. Put the stones onto the pebble bed as shown.
1. Carefully slot the brackets on to the engine hooks
FLAME OPERATION
1. When you press" "button, you can set the
flame effect up to 2 levels of brightness. Press "
" the button once, the flame effect will be illuminated
at level 1. Press twice and the flame effect will be
illuminated at level 2.
2. When you press the " " button 3 times, you
turn off the flame effect. All of heating functions are
switched off too.
HEATING OPERATION
STEP THREE
IMPORTANT: The main POWER switch on engine
must be switched ON prior to operating by remote
control or manual control.
NOTE:
1. Heating function can be controlled by either
control panel or remote control unit.
2. The remote control unit uses two AAA batteries.
3. If you do not use the remote for a long period of
time. remove the battery to avoid possible damage
from battery corrosion.
4. If the remote does not function correctly or if the
operating becomes reduced, try to replace the
battery with new one.
2. Check that the hole in the bottom bracket aligns
with the position marked from the template
previously, then secure the bottom bracket on the
wall.
1. When you press " " button once, you can set
heating effect at 1000W, when you press twice, you
turn off heating function.
2. When you press " " button once, you can set
heating effect at 2000W, when you press twice, you
can set heating effect at 1000W. Make sure " "
indicator light on prior to operating " " button.
WARNING:
Only hang the glass front to the fire after fire has
been securely fitted to the wall. Check the product
periodically to ensure that no fitting has loosened
and needs attention.
STEP FOUR
Page 4 of 6