b. Reconnect the 6-pin plug on the bottom cable of the X2 logger to the battery harness cable.
15. Align the plate and re-install the (8) bolts with lock washers, tightening them in a cross-pattern using a 9/16″
socket wrench.
a. Orient the SOLAR/COM port towards one of the deployment tubes for easier access when the solar
tower is installed.
b. Ensure there are no substantial gaps between the data logger plate and the metal frame of the buoy
data well.
16. Re-install the solar tower and move the buoy outside. Power on the logger using the solar tower plug and
gather multiple hours of readings to ensure the primary power is increasing while the buoy is in direct
sunlight.
Re-connect the data well 6-pin cable connection.
Bolt down the X2-CB/X2-CBMC.
Bolt down the logger in a crisscross pattern.
28
Содержание X2-CB
Страница 11: ...Select sensors from drop down list 11...
Страница 17: ...Cellular X2 C to WQData LIVE 17...
Страница 18: ...Iridium X2 I to WQData LIVE 18...
Страница 19: ...Radio to Cellular X2 RC to WQData LIVE 19...
Страница 48: ...Iridium X2 data flow 48...
Страница 94: ...Rotate the antenna bushing counterclockwise to remove the antenna 94...
Страница 99: ...Push down on the antenna assembly and turn the bushing clockwise to securely re install the antenna 99...
Страница 108: ...13 Remove the Main SD Card Main SD Card Location 108...