3x15mm screw /
Schraube
...........................................2
Spring...............................................2
Main landing gear (5mm).................2
Landing gear (5mm).........................1
2- Landing gear / Fahrwerk
Aluminum tube
Hauptfahrwerk
Fahrwerksdraht
Two holes on the left and the right side of the fuselage are pre-drilled at factory
5mm Main landing gear
5mm landing
gear
Aluminum tube
Stopper (metal)
5.5mm Collar
Collar
Stellring
3x12mm screw
...................8
Nylon strap
............4
Stopper (metal)
...........2
..............4
3mm set screw
Kunststoffstreifen
1- Landing gear / Fahrwerk
A B
FUSELAGE
REAR VIEW
FUSELAGE
REAR VIEW
X
5.5mm Collar
...........4
3- Vertical Stabilizer
Seitenleiwerk
! Securely glue together. If coming
off during flight, you lose control
of your air plane.
5mm gear (rear)
5mm landing gear
(front)
5mm landing gear
(rear)
L/R
L/R
TOP VIEW /
Draufsicht
BOTTOM - VIEW /
Unteransicht
Note: All holes on the bottom of the
fuselage are pre-drilled at factory
Paint the epoxy 30min. Where
the vertical stabilizer meet the
fuselage.
All blindnuts are
installed at factory
L/R
A B
A B