Step 9: Plug the power adapter into a power outlet. The 
Power LED (C) must light up;
Step 10: Consult with the customer which is the 
prefered mode. Select the desired mode using the Mode 
Selection switch (F).

5.7 INTERNET CONNECTION

 

The Internet connection can be established via WiFi or 
Ethernet. For WiFi connection, follow steps of chapter 6.

For Ethernet connection:
Step 1: Pass the UTP cable through the grey rubber 
cable inlet and clamp a RJ45 connector to the cable.
Step 2: Check if the RJ45 connectors are OKAY with a 
network cable tester;
Step 3: Connect the UTP cable to the Ethernet port of 
the charge point, as described in section section ‘3.4.1 
Overview of Connections’ and to the households router 
with DHCP (or indirectly via a switch or hub).

5.8 FINISHING UP (CLOSE 

ENCLOSURE)

Step 1: Check and make sure that the rubber seal of the 
casing is properly in place on the edge;
Step 2: Place the cover on the charge point;
Step 3: Hand-tighten the four M4 x 12mm T20 bolts 
provided around the socket so that the cover closes on 
the rubber seal but the rubber seal does not deform;
Step 4: Hand-tighten the other two M4 x 12 mm T20 
bolts provided in the bottom of the cover;
Step 5: Turn the socket lid clockwise in the cover and 
hand-tighten the M4 x 16 mm T20 bolt provided;
Step 6: Switch on power to the charge point;
Step 7: Wait until charge point is fully started up (+/-10 
minutes, the LED should be off)

5.9 CHARGE POINT CONFIGURATION

Charge point configuration should be done after the 
charge point is powered on, using the Home Charging 
by NewMotion app. To configure charge point features 
such as Load Shedding, please follow the instructions 
as desribed in chapter 6 of this installation manual.

5. INSTALLATION PROCEDURE

Содержание Home Advanced Edition 11

Страница 1: ...100 cm Home Advanced Edition 7 Home Advanced Edition 11 INSTRUCTION MANUAL EN VERSION 07A0RNM20ENG05 2020...

Страница 2: ......

Страница 3: ...th terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breaker...

Страница 4: ...d charge point can be connected to a Charge Point Operator CPO backoffice via WiFi or ethernet In case of an error or issue on site support is needed from a ZE Ready certified installer Your Renault d...

Страница 5: ...5 or CAT6 RJ45 UTP cable crimp tool RJ45 connectors Network cable tester For Load Shedding functionality RJ12 cable straight for Load Shedding module connection Free schuko socket in fuse box for powe...

Страница 6: ...unication backoffice Communication Load Shedding module 07A _ _ _ _ _ 07B _ _ _ _ _ Home Advanced 7 single phase 32A Home Advanced 11 triple phase 16A Home Advanced 7 3 7 kW single phase 16A Home Adva...

Страница 7: ...IFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS Backoffice protocol Stand by consumption Operating temperature range Operating humidity range Operating air pressure range Maximum moun...

Страница 8: ...P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 07A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid RFID Reader Identification label with serial numbe...

Страница 9: ...02INT01 INSTRUCTION MANUAL P9 P9 07A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS Ethernet port Earthing pole UTP data cable inlet with rubber seal Inlets for power cables Power cables...

Страница 10: ...ENG05 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW INSTALLING ACCESSORIES 5 wires 1 5mm2 accessories cable inlet Cable clamp ON OFF Peak connection L2 L3 from accessories cable P1 Port for Load Shedding Shunt co...

Страница 11: ...ate for the specific situation and according to local regulations The installer must select a suitable MCB with C characteristic to match the amperage setting of the charge point taking into account M...

Страница 12: ...during installation 5 4 LOAD SHEDDING MODULE The Load Shedding Module package contains one Load Shedding module one power adapter and three current transformers CT s The CT s must be connected at the...

Страница 13: ...appropriate grommet to suit the cable thickness and place it in the opening of the power cable inlet Lubricate if necessary to make it easier to feed the power cable through Step 3 Remove the wire bri...

Страница 14: ...r indirectly via a switch or hub 5 8 FINISHING UP CLOSE ENCLOSURE Step 1 Check and make sure that the rubber seal of the casing is properly in place on the edge Step 2 Place the cover on the charge po...

Страница 15: ...Follow the steps as described in the Home Charging by NewMotion app Use the QR Code for WiFi connection which is included in the charge point package when the Home Charging by NewMotion app requests...

Страница 16: ...rge session 7 USER MANUAL Position C Charging will only happen in Off peak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 3 TRO...

Страница 17: ......

Отзывы: