newmotion Home Advanced Edition 11 Скачать руководство пользователя страница 11

INSTALLATIEHANDLEIDING – P11 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P11  | 

P11

07A0RNM20ENG05

Wiring advice*

Power cable size

Earthing advice*

Required nominal 

input voltage at 

charge point

MCB

RCD

Ethernet connection 

cable requirements

Load Shedding cable 

requirements

5 wires Ø 1,5mm

2

 

accessories cable

Ø 10mm - Ø 22,5mm

10 mm

2

 solid wire

6 mm

2

 stranded wire with ferrules

PE-cable (PEN conductor is not allowed)

Separately installed grounding electrode 
< 100 Ohm spreading resistance

230V+N +/-10% 50Hz

400V (3 x 230V+N) +/-10% 50Hz

Cable grommets sizes

Maximum cable terminal block

TN-system

TT-system

Single phase

Triple phase

4. INSTALLATION DETAILS

The installer is responsible for selecting a cable thickness & safety components appropriate for 

the specific situation and according to local regulations

*   The installer is always responsible for selecting a cable thickness appropriate for the specific situation and 

according to local regulations;

**  The installer must select a suitable MCB with C-characteristic to match the amperage setting of the charge point, 

taking into account MCB manufacturer specifications and EV-Ready guidelines;

NOTE

: The charge point can be set between 16 A / 20 A / 25 A and 32 A (depending on version)

- Wire for the maximum hardware amperage under continuous load;
- Calculate with a COS-Phi of 0.8;
- Calculate with a max allowed voltage drop over the cable of 2%;
- Use shielded cable for underground wiring

C-characteristic**

30mA Type B, or 30mA Type A (Hi, Hpi, Si) in combination with appropriate 
equipment that guarantees shutdown of power when a DC leakage of more than 6mA 
occurs

Standard CAT5 or CAT6 Ethernet cable (UTP cable with RJ45 connectors)

Straight wired RJ11 or RJ12 (6P6C) connectors on CAT5 UTP cable (max 100m)

- L1, L2, L3, N + PE;
 

L1 & N for connecting the shunt

 

L2 & L3 for connecting the ON/OFF Peak signal

- Always connect PE to terminal blocks of charge point and at distribution board
- Use shielded cable for underground wiring;

Содержание Home Advanced Edition 11

Страница 1: ...100 cm Home Advanced Edition 7 Home Advanced Edition 11 INSTRUCTION MANUAL EN VERSION 07A0RNM20ENG05 2020...

Страница 2: ......

Страница 3: ...th terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breaker...

Страница 4: ...d charge point can be connected to a Charge Point Operator CPO backoffice via WiFi or ethernet In case of an error or issue on site support is needed from a ZE Ready certified installer Your Renault d...

Страница 5: ...5 or CAT6 RJ45 UTP cable crimp tool RJ45 connectors Network cable tester For Load Shedding functionality RJ12 cable straight for Load Shedding module connection Free schuko socket in fuse box for powe...

Страница 6: ...unication backoffice Communication Load Shedding module 07A _ _ _ _ _ 07B _ _ _ _ _ Home Advanced 7 single phase 32A Home Advanced 11 triple phase 16A Home Advanced 7 3 7 kW single phase 16A Home Adva...

Страница 7: ...IFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS Backoffice protocol Stand by consumption Operating temperature range Operating humidity range Operating air pressure range Maximum moun...

Страница 8: ...P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 07A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid RFID Reader Identification label with serial numbe...

Страница 9: ...02INT01 INSTRUCTION MANUAL P9 P9 07A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS Ethernet port Earthing pole UTP data cable inlet with rubber seal Inlets for power cables Power cables...

Страница 10: ...ENG05 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW INSTALLING ACCESSORIES 5 wires 1 5mm2 accessories cable inlet Cable clamp ON OFF Peak connection L2 L3 from accessories cable P1 Port for Load Shedding Shunt co...

Страница 11: ...ate for the specific situation and according to local regulations The installer must select a suitable MCB with C characteristic to match the amperage setting of the charge point taking into account M...

Страница 12: ...during installation 5 4 LOAD SHEDDING MODULE The Load Shedding Module package contains one Load Shedding module one power adapter and three current transformers CT s The CT s must be connected at the...

Страница 13: ...appropriate grommet to suit the cable thickness and place it in the opening of the power cable inlet Lubricate if necessary to make it easier to feed the power cable through Step 3 Remove the wire bri...

Страница 14: ...r indirectly via a switch or hub 5 8 FINISHING UP CLOSE ENCLOSURE Step 1 Check and make sure that the rubber seal of the casing is properly in place on the edge Step 2 Place the cover on the charge po...

Страница 15: ...Follow the steps as described in the Home Charging by NewMotion app Use the QR Code for WiFi connection which is included in the charge point package when the Home Charging by NewMotion app requests...

Страница 16: ...rge session 7 USER MANUAL Position C Charging will only happen in Off peak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 3 TRO...