![newmotion Home Advanced Edition 11 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/newmotion/home-advanced-edition-11/home-advanced-edition-11_instruction-manual_1679894011.webp)
INSTALLATIEHANDLEIDING – P11
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P11 |
P11
07A0RNM20ENG05
Wiring advice*
Power cable size
Earthing advice*
Required nominal
input voltage at
charge point
MCB
RCD
Ethernet connection
cable requirements
Load Shedding cable
requirements
5 wires Ø 1,5mm
2
accessories cable
Ø 10mm - Ø 22,5mm
10 mm
2
solid wire
6 mm
2
stranded wire with ferrules
PE-cable (PEN conductor is not allowed)
Separately installed grounding electrode
< 100 Ohm spreading resistance
230V+N +/-10% 50Hz
400V (3 x 230V+N) +/-10% 50Hz
Cable grommets sizes
Maximum cable terminal block
TN-system
TT-system
Single phase
Triple phase
4. INSTALLATION DETAILS
The installer is responsible for selecting a cable thickness & safety components appropriate for
the specific situation and according to local regulations
* The installer is always responsible for selecting a cable thickness appropriate for the specific situation and
according to local regulations;
** The installer must select a suitable MCB with C-characteristic to match the amperage setting of the charge point,
taking into account MCB manufacturer specifications and EV-Ready guidelines;
NOTE
: The charge point can be set between 16 A / 20 A / 25 A and 32 A (depending on version)
- Wire for the maximum hardware amperage under continuous load;
- Calculate with a COS-Phi of 0.8;
- Calculate with a max allowed voltage drop over the cable of 2%;
- Use shielded cable for underground wiring
C-characteristic**
30mA Type B, or 30mA Type A (Hi, Hpi, Si) in combination with appropriate
equipment that guarantees shutdown of power when a DC leakage of more than 6mA
occurs
Standard CAT5 or CAT6 Ethernet cable (UTP cable with RJ45 connectors)
Straight wired RJ11 or RJ12 (6P6C) connectors on CAT5 UTP cable (max 100m)
- L1, L2, L3, N + PE;
L1 & N for connecting the shunt
L2 & L3 for connecting the ON/OFF Peak signal
- Always connect PE to terminal blocks of charge point and at distribution board
- Use shielded cable for underground wiring;