
P.O. Box 1306
Newport Beach
California 92663
Phone: 714-751-0488
Fax: 714-957-1621
E-Mail: [email protected]
Site Power System
Installation/Operation Manual
Models: SPS 12-20, SPS 24-10, SPS 48-6
Table of Contents
Page Table of Contents
Page
1 Principles of Operation
2
2.5 Multiple Units
7
1.1 Introduction
2
2.6 Internal Alarm Card
7
1.2 LEDs
2
2.6.1 Relays
8
1.3 Display
2
2.6.2 Rectifier Fail/AC Fail
8
1.4 Auto Float Boost
2
2.6.3 Rectifiers in Parallel
9
1.5 Low Voltage Disconnect and Reset
3
2.7 Commissioning the Rectifier
9
1.6 Temperature Compensation
3
3 Servicing
9
1.7 Current Limit
3
3.1 Warnings
9
1.8 Output Over Voltage Shut Down
4
3.2 Troubleshooting
10
1.9 Input Over Voltage Shut Down
4
3.3 Fuses
10
1.10 Input Inrush Current Limiter
4
4 Adjustments
10
1.11 Over Temperature Shutdown
4
4.1 Standard Settings
11
1.12 Reverse Polarity Protection
4
4.2 Adjust Float Voltage
11
1.13 Parallel Rectifier Operation
4
4.3 Adjust Boost Voltage
11
1.14 External Shutdown
4
4.4 Adjust Boost to Float Current Threshold
12
1.15 Alarm & Control Interface
4
4.5 Adjust Current Limit
12
1.16 Internal Alarm Card
5
4.6 Adjust Over Voltage Shutdown
12
2 Installation
5
4.7 Adjust Low Voltage Disconnect and Hystersis 12
2.1 General Warnings
5
4.8 Adjust Temperature Compensation Slope
12
2.2 Postioning of SPS
5
4.9
Adjusting the Alarm Output Volt Low/High Setting
13
2.3 Cabling
6
5 Optional Accessories
13
2.4 Temperature Compensation
7
6 Warranty
13
7 Dimensional Drawings
14
Manual-SPS
As of May 2012