NewMar SPS 12-20 Скачать руководство пользователя страница 1

P.O. Box 1306

 Newport Beach

   California 92663

   

  

Phone: 714-751-0488  

     Fax: 714-957-1621

     E-Mail: [email protected]

Site Power System

Installation/Operation Manual

Models: SPS 12-20, SPS 24-10, SPS 48-6

Table of Contents

Page Table of Contents

Page

1 Principles of Operation

2

2.5 Multiple Units

7

1.1 Introduction

2

2.6 Internal Alarm Card

7

1.2 LEDs

2

2.6.1 Relays

8

1.3 Display

2

2.6.2 Rectifier Fail/AC Fail

8

1.4 Auto Float Boost

2

2.6.3 Rectifiers in Parallel

9

1.5 Low Voltage Disconnect and Reset

3

2.7 Commissioning the Rectifier

9

1.6 Temperature Compensation

3

3 Servicing

9

1.7 Current Limit

3

3.1 Warnings

9

1.8 Output Over Voltage Shut Down

4

3.2 Troubleshooting

10

1.9 Input Over Voltage Shut Down

4

3.3 Fuses

10

1.10 Input Inrush Current Limiter

4

 4 Adjustments

10

1.11 Over Temperature Shutdown

4

4.1 Standard Settings

11

1.12 Reverse Polarity Protection

4

4.2 Adjust Float Voltage

11

1.13 Parallel Rectifier Operation

4

4.3 Adjust Boost Voltage

11

1.14 External Shutdown

4

4.4 Adjust Boost to Float Current Threshold

12

1.15 Alarm & Control Interface

4

4.5 Adjust Current Limit

12

1.16 Internal Alarm Card

5

4.6 Adjust Over Voltage Shutdown

12

2 Installation

5

4.7 Adjust Low Voltage Disconnect and Hystersis 12

2.1 General Warnings

5

4.8 Adjust Temperature Compensation Slope

12

2.2 Postioning of SPS

5

4.9 

Adjusting the Alarm Output Volt Low/High Setting

13

2.3 Cabling

6

5 Optional Accessories

13

2.4 Temperature Compensation

7

6 Warranty

13

7 Dimensional Drawings

14

Manual-SPS

As of May 2012

Содержание SPS 12-20

Страница 1: ...2 Troubleshooting 10 1 9 Input Over Voltage Shut Down 4 3 3 Fuses 10 1 10 Input Inrush Current Limiter 4 4 Adjustments 10 1 11 Over Temperature Shutdown 4 4 1 Standard Settings 11 1 12 Reverse Polari...

Страница 2: ...e the present state of the rectifier and diagnose faults AC On This LED glows green to indicate that AC power is connected to the unit and that the primary stages of the rectifier are operating Shutdo...

Страница 3: ...ches the battery ve supply the v is common with the battery Do not connect the Battery and Load v together The LVD voltage and the LVD Hysterisis voltage are preset in the factory but may be adjusted...

Страница 4: ...if they fail 1 13 Parallel Rectifier Operation The SPS may be connected in parallel to source more current or to provide a degree of redundancy The rectifiers should have the load share signal connect...

Страница 5: ...ethal even after the input supply has been removed The rectifier contains components at High Temperatures that may burn if touched 2 2 Positioning of SPS A great deal of care should be taken with posi...

Страница 6: ...t outlet be used so the rectifier will not be accidentally unplugged from the supply When hard wiring AC input the IEC AC cord provided should be wired as follows BLK WHT GRN 120 VAC L N Safety Ground...

Страница 7: ...w an internal protection fuse requiring the SPS to be returned for servicing Do not connect the Temperature Compensation Probe to the Site Power System until commissioning see Section 2 7 Start Up 2 5...

Страница 8: ...fier Fail alarm Rectifier Off Normal and the Low Volts alarms will also activate Note that the AC Fail Relay has its own Common connector but all the other alarm outputs share a Common contact 2 6 2 R...

Страница 9: ...y connections and then plug them into the SPS Re connect the mains and the Float Boost LED should glow first yellow then after about 10 seconds either green or yellow depending on the charge of the ba...

Страница 10: ...e current drawn by the battery from the SPS is as expected Check that the battery takes the charge Connect the DC load to the SPS with AC off and disconnect the battery Turn AC on and check that the c...

Страница 11: ...m back of unit with AC input socket on left 4 2 Adjust Float Voltage Connect a variable load set to minimum load to the battery connections of the rectifier Disconnect the Temperature Compensation Pro...

Страница 12: ...ction Disconnect the Temperature Compensation Probe Connect an accurate voltmeter across the output Turn the mains on to the rectifier and adjust the variable voltage power supply up until the unit go...

Страница 13: ...ature Compensation Probe Connect an accurate voltmeter across the output Turn AC and adjust the variable voltage power supply up until the alarm activates Adjust the Alarm Output High trimpot to adjus...

Страница 14: ...P O Box 1306 Newport Beach California 92663 Phone 714 751 0488 Fax 714 957 1621 E Mail techservice newmarpower com 7 Dimensional Drawings 14...