NewLine TradePro Скачать руководство пользователя страница 8

8

A.  Fasten handle to door.

B.  Fit bottom door seal.

C.  Fit deflector seal to back of door.

D.  Fit additional deflector seal to leading edge of 

front fixed glass.

INSTALLATION

7

Drill three equally spaced 3.2mm holes into the wall channels (1) and (2) on the 

INSIDE

 of the 

screen.  

Make sure that your drill holes are more than 20mm back from the glass edge when using 
the smallest screen size. Otherwise you risk breaking the glass (see Diagram E). 

Make 

sure that all the holes go though both the aluminium of the fixed side panel and the door 

front assembly. Fix off wall channels (1) and (2) to fixed side panels (3) and (4) using the fixed 

panel screws (6) and covering them with screw caps (7).

DIAGRAM E:

20MM

DRILL HERE

OUTSIDE OF SHOWER

8

Содержание TradePro

Страница 1: ...age 2 Advise Newline on 0508 639 5463 if any damage has occurred or a defect identified within 8 hours of receiving the goods so this can be rectified 3 Do not proceed with installation until resolved...

Страница 2: ...Unpack all glass assemblies Stand glass on soft packaging on the floor and against a wall Care must be taken not to strike any edge or corner against a hard surface as this will chip and destroy the...

Страница 3: ...turn panel wall channel PAR5209 1 3 Fixed return panel 1 4 Door front assembly 1 5 Handle set K9751 1 6 Fixed panel screws 4x10mm SCREW PACK PAR7289 12 7 Fixed panel screw caps 10 8 Wall channel fixin...

Страница 4: ...wall profiles at 22mm off the acrylic tray edge 2 Recalculate the specific position if tray is not level walls are out of plumb protruding or curving inwards more than 5mm SHOWER TYPE FRONT PANEL A MI...

Страница 5: ...te tray instructions 2 The standard liner is matched if using 10mm Aqualine Gib with clearance each side to allow glue and any minor discrepancies in walls The following table covers the door size wit...

Страница 6: ...ion Diagram A3 Apply a continuous 7mm bead of silicone on back of channel Fix channel in place with screws checking it remains plumb Diagram A2 A1 A2 A3 Go to the layout plan on pages 4 and 5 to ident...

Страница 7: ...Panel positioned on the boundary line They should be positioned evenly between both wall channels and aligned evenly to tray edge Drill and fasten off the bottom rail on the inside Using a level ensur...

Страница 8: ...the screen Make sure that your drill holes are more than 20mm back from the glass edge when using the smallest screen size Otherwise you risk breaking the glass see Diagram E Make sure that all the ho...

Страница 9: ...e shower screen because water can build up over time within the wall channel and leak out of the shower area The screen is designed to allow the water to return into the shower area if any is present...

Отзывы: