background image

6

This is a brief overview of how to set up a door assembly only. This runs in conjunction with the general 
instruction sheet.

Step 1

,Z[HISPZOHUV\[LYIV\UKHY`SPULHJYVZZ[OLIHZLHUK\WLHJO^HSS\ZL[OLº:OV^LY3PUL[V;YH`,KNL»[HISL

HIV]L

Step 2

6U[OLZPKLVM[OLÄ_LKNSHZZMHZ[LU[OL^HSSJOHUULS[VIV\UKHY`SPUL

Step 3

7SHJLMYVU[Ä_LKNSHZZWHULSPU[V^HSSJOHUULS7S\TISLHKPUNLKNLVMNSHZZWHJRHZULLKLK

Step 4 

Fix the rail 

(13)

 to the front glass

 (18)

^P[OYHPSÄ_PUNZ

 (8)

9LMLY[VKYH^PUNHUKKL[HPS)VUWHNL

Next Step

 To replicate the mounting point on the opposite side for the rail.

A:

4LHZ\YL[OLYHPSWVZP[PVUIHJRMYVT[OLV\[LYIV\UKHY`SPULH[[OLÄ_LKNSHZZ^HSSLUK

B:

4LHZ\YL[OLOLPNO[MYVT[OLIHZL[V[OLYHPSVU[OLÄ_LKNSHZZ^HSSLUK

C: 

Mark A and B on opposite side. Hold the level on the rail and double check the marked height.

NOTE:

 Have wall mounting 2mm lower to establish slight fall to shut position.

E:

<ZL[OLYHPSQVPULYHZZLTIS`

 (14)

 to mark the two holes on the wall.

F:

7YLKYPSS[OL^HSSHUKMHZ[LU\WQVPULYHZZLTIS`[VIV[O[OL^HSSHUK[V[OLYHPS

All other installation steps can be now followed in the general instructions eliminating the return panel details 
that do not apply.

ANITA ALCOVE (DOOR ONLY) -  LAYOUT PLAN C

NOTE: 

(SSTLHZ\YLTLU[ZHZZ\TL[OLÅVVYPZSL]LS[OL^HSSZHYLWS\TI

HUKHSSZ\YMHJLZHYLÅH[(U`]HYPH[PVUT\Z[ILHKQ\Z[LKMVYPU[OL

measurements provided.

OPTION C: ANITA ALCOVE (1200 DOOR SET) 

WITH TILE 

)(:,(5+(*9@30*)(:,(7730*(;065:

The following table covers the Door Size with the Minimum 
and Maximum Range. Care must be taken if using the 
minimum or maximum measurements as discrepancies in 
the walls or base may not allow for this.

SHOWER DOOR TYPE

FRONT DOOR PANEL MIN/MAX

1200 Door

1151 - 1178mm

SHOWER LINE TO TRAY EDGE

Acrylic Tray

20mm

7YV-PUPZO;PSL;YH`/VI TT
7YV-PUPZOSL]LSLU[Y`[YH`H[[YHUZP[PVUSPUL:SVWLZ[HY[Z

Height

Depth

Dotted Line:  

Outer boundary

Shower Line to Tray Edge 

:LL;HISL

Rail Joiner:  

Mounted on 
door side

14

25

PENETRATION OF WATERPROOFING UNDER TILES

>H[LYWYVVÄUN^HYYHU[PLZHYLWV[LU[PHSS`]VPK^P[OWLUL[YH[PVUZVMTLTIYHUL)VUK^HSSWYVÄSLZ^P[O)VZ[PR=
4PUPT\TJ\YPUNOV\YZTT[VTT*\YPUNPZI`H[TVZWOLYPJTVPZ[\YLHIZVYW[PVUHWWYV_TTPUKH`Z

Содержание Anita 2 Sided

Страница 1: ...ght damage or defects 2 GYLVH 1HZOLQH RQ LI DQ GDPDJH KDV RFFXUUHG RU GHIHFW LGHQWL HG ZLWKLQ KRXUV RI UHFHLYLQJ WKH JRRGV VR WKLV FDQ EH UHFWL HG 3 Do not proceed with installation until resolved as...

Страница 2: ...t a hard surface as this will chip and destroy the glass panel Installation Glass panels and assemblies are heavy Two man lifting is recommended for handling and installation Determine positioning of...

Страница 3: ...istered plumber for installation all supply and waste items prior to tray and wall linings DWHUSURR QJ 3UR LQLVK 7LOH 7UD V This must comply with AS NZS 4858 2004 and be undertaken by JLY P LK HWWSPJH...

Страница 4: ...uffer Seal Strip I8526 1 17 Threaded Screws M5 x 10 2 6 Handle Set 1 18 YVU P_LK 7HULS 2 7 3VJR 0U 2UVI L Z VVY K1519 2 19 H LY L LJ VY I8595 1 8 Front Glass To Rail Fixing K1526 2 Screw Pack K0895 1...

Страница 5: ...TO 1200 X 915 Anita Acrylic Shower with Newline Acrylic Tray and ABS Acrylic Liner L V OL UP H OV LY I THYRPUN V OL V ZPKL SPUL VM OL HSS JOHUULSZ 20mm in from the outside edge of the tray This will a...

Страница 6: ...OUT PLAN B A A A DOTTED LINE 6 9 55 3 6 5 9 305 RETURN GLASS EDGE 44 2 964 6 305 IMPORTANT DETAIL NOTE All measurements HZZ TL OL VVY PZ SL LS the walls are plumb and all Z YMHJLZ HYL H U HYPH PVU T Z...

Страница 7: ...OL HSS HUK MHZ LU W QVPULY HZZLTIS V IV O OL HSS HUK V OL YHPS All other installation steps can be now followed in the general instructions eliminating the return panel details that do not apply ANIT...

Страница 8: ...WSHJL P O OL 4 _ ZJYL Z LUZ YPUN OH OL channel remains plumb 0UZLY OL YL YU WHULS HUK _LK MYVU WHULS PU V OL HSS JOHUULSZ TILING NOTE 7SHJL TT PKL OPU JSLHY WSHZ PJ Z YPWZ HZ PZVSH PVU WHJRLYZ H KLNYL...

Страница 9: ...YVU WHULS P O OL V NSHZZ _PUN WPLJLZ HUK PNO LU OLZL PNO LU OL HSSLU RL Z VU OL QVPULY V OL YHPS OLU OL YL YU NSHZZ PZ H KLNYLLZ VMM HSS 0M TVYL HKQ Z TLU PZ YLX PYLK TV L OL NSHZZ MYVU WHULS P OPU OL...

Страница 10: ...PUN VMMZL PU YVSSLYZ VY HKQ Z TLU MYVT OL YHPS Z WWVY OPZ WVPU assess if the return panel needs to go in or out slightly to align the door parallel to the tray VUK P O ZPSPJVUL OL MVSSV PUN WHY Z V OL...

Страница 11: ...JOVZLU WVZP PVU H VPKZ KYPSSPUN OYV NO OL NSHZZ ZLL PHNYHT JYL VNL OLY ZPUN 4 JYL Z V LY OL ZJYL Z P O ZJYL JV LY JHWZ 0UZ HSS SLHKPUN LKNL I MMLY Z YPW I MMLY ZLHS 0UZ HSS OL OHUKSL ZL P O OL SVJRPUN...

Страница 12: ...used on the inside of the shower screen because water can build up over time within the wall channel and leak out of the shower area The screen is designed to allow the water to return into the shower...

Отзывы: