2
ENSURE YOU TICK THE SPECIFIC BOXES THAT APPLY AS YOU PROGRESS
Floor & Walls:
-SVVYT\Z[SL]LS^P[OUVKLÅLJ[PVUHUK^HSSZWS\TIHUKÅH[;OPZPZVMHSSPTWVY[HUJLMVYH
successful installation.
Tray and Liner:
0UZ[HSSH[PVUMVY[PSL[YH`ZVYHJY`SPJ[YH`ZSPULYHYLZ\WWSPLK^P[O[OLZWLJPÄJ[YH`VYKLYLK
Frame:
1.
:DOO3URзOH2SWLRQV
Acrylic Tray:
Centred 20mm off outside of tray edge
Hob Tile Tray:
*LU[YLKTTVMMÄUPZOLK[PSLLKNL[OPZ^PSSHSSV^TTVMM[YH`ILMVYL[PSPUN
Level Entry:
*LU[YLKH[[OL[YHUZP[PVUSPUL^OLYLZSVWLILNPUZ
2.
6ROLGз[LQJIRU:DOO5DLO%UDFNHW
(ZPKLKVUS`VU[OLKVVYZPKLHKQHJLU[^HSS
([[HJOHTT]LY[PJHSSLUN[OVMMYHTPUNVU[OLPUZPKLVM[OL^HSSWYVÄSLZ[\KZ[HY[PUNH[[OLSV^LZ[
WVPU[VMTTVMM[OLÅVVY[VTTH[[OL[VW
3.
6ROLGз[LQJVIRUZDOOPRXQWHGSOXPELQJзWWLQJV
Consult with the plumber.
Wet Grade lining:
Aqualine Gib. or equivalent “must be used behind all shower installations for compliance”
Plumbing:
Use a registered plumber for installation all supply and waste items prior to tray and wall linings.
:DWHUSURRзQJϋ3UR)LQLVK7LOH7UD\Vό
This must comply with AS/NZS 4858:2004 and be undertaken by
JLY[PÄLKHWWSPJH[VYHUKH7YVK\JLY:[H[LTLU[WYV]PKLK;OLYLPZHSPZ[VMWYV]LUZ`Z[LTZVUV\Y^LIZP[L
www.newline.co.nz
Tiling:
1.
5L^SPULYLX\PYLZ[OL\ZLVMJVTWSL[LZ`Z[LTZI`SPJLUJLK[YHPULKHWWSPJH[VYZ>H[LYWYVVÄUN;PSL
(KOLZP]L.YV\[PUNHUK:PSPJVULKL[HPSPUNMVYM\SSHJJV\U[HIPSP[`HUKWLYMVYTHUJLYLX\PYLTLU[Z
2.
;OL[PSLZT\Z[JVUMVYT[VNYHKPLU[ZWYV]PKLK^P[O[OL¸7YV-PUPZO;PSL;YH`¹[VJVTWS`[V5A)\PSKPUN
Code.
4VPZ[\YLYL[HPUTLU[VM[OLZOV^LYLUJSVZ\YLT\Z[ILKL[HPSLK^P[OH¸>H[LY:[VW¹[VTLL[[OL(:
requirements.
4. The line where shower screen sits must be level for an acceptable installation.
PREPARATION CHECKLIST
ANITA SHOWER - INDEX
;OLYLHYL[OYLLSH`V\[WHNLZWYV]PKLK7SLHZLLUZ\YL`V\ZLSLJ[[OLJVYYLJ[SH`V\[WHNLHUKJVTIPUL
this with the installation details.
2 Exploded View Assembly Diagram
Page 3
:PKLK(JY`SPJ3H`V\[7SHU(
Page 4
:PKLK;PSL^P[O7YV-PUPZO;PSL;YH`3H`V\[7SHU)
Page 5
(SJV]L+VVY6US`3H`V\[7SHU*
Page 6
Installation
Steps
Page 7