Installation and commissioning
14
Manual DMT-TFT.110
4
Installation and commissioning
The DMT-TFT.110 may only be installed by a trained electrician.
Information on the qualifications required by the lift engineer can be found in the manual FST Installation &
Commissioning (See chapter “1.3 Further information” on page 6).
Electrostatic charging
›
Keep the electronic assembly in its original packaging until installation to prevent damage.
›
Before opening the original packaging, a static discharge must be performed!
To do this, touch a grounded piece of metal.
›
During work on electronic assemblies, periodically repeat this discharge procedure!
›
Equip all bus inputs/outputs not in use with a terminal resistor (terminator) to prevent malfunctions.
4.1
Unpacking
►
Remove the packaging material completely.
►
Peel the protective film off the display screen.
After installation, it is no longer possible to remove the protective film.
4.2
Installation
The clarity of the display depends on the viewing angle; the installation position of the display is
therefore critical in achieving an optimum result.
►
Determine the installation position before mounting.
►
Make sure that the installation position matches the orientation of the display.
DMT-TFT.110
– The display is not positioned symmetrically on the assembly.
Pressure or tension can damage the circuit board.
►
Do not overtighten the nuts!
Содержание EAZ DMT-TFT.110
Страница 1: ...Destination call terminal MANUAL DMT TFT 110...
Страница 10: ...Technical data 10 Manual DMT TFT 110 Front view schematic diagram Front view example of installation and design...
Страница 46: ...NOTES...
Страница 47: ...NOTES...