4 Installation and Commissioning
A6_BA.EN05/01
17
4.2 Commissioning the A6 Safety Monitoring Device
The shaft components are connected to the A6 Safety Monitoring Device
according to the instructions of the controller manufacturer after installing
the controller cabinet in the machine room.
With NEW LIFT controls, the A6 Safety Monitoring Device is always mount-
ed and wired in the controller cabinet.
Requirements
-
Safety circuit in operation
-
Control in operation
-
Awareness of all possible dangers in the shaft and how to avoid them.
-
Installation and wiring of the A6 Safety Monitoring Device and sensors
A and B completed.
Sensor switching points
The sensor switching points must be adjusted so that in the zone area sen-
sor A is closed and sensor B open. The zone area is ±0,2 m (±0,35 m) from
the levelling position with symmetrical switching points.
Commissioning
The A6 Safety Monitoring Device must be commissioned together with the
lift controller system used. The commissioning instructions of your control-
ler manufacturer will give you more information.
WARNING!
Electric hazard due to live wires and parts.
Death or serious injury.
Make sure system is off circuit.
All installation work on electrical parts must be carried out with the
system shut down and off circuit.
Содержание A6 PL 0 10 2.2
Страница 1: ...Manual A6 Safety Monitoring Device PL 0 10 2 2...
Страница 4: ...Contents 4 A6_BA EN05 01...
Страница 14: ...3 Important Facts about your A6 Safety Monitoring Device 14 A6_BA EN05 01 Notes...
Страница 20: ...5 Troubleshooting and Servicing 20 A6_BA EN05 01 Notes...
Страница 21: ...6 Declarations of Conformity A6_BA EN05 01 21 6 Declarations of Conformity...
Страница 23: ......