New lift A6 PL 0 10 2.2 Скачать руководство пользователя страница 12

3   Important Facts about your A6 Safety Monitoring Device

12

  A6_BA.EN05/01

3.3    Dimensions and Technical Data

Dimensions

Abb. 3.3

 Dimensions of the A6 Safety Monitoring Device

A 6 00 4 .c d r

to p -h a t  ra il

m o u n tin g   lo c k

Содержание A6 PL 0 10 2.2

Страница 1: ...Manual A6 Safety Monitoring Device PL 0 10 2 2...

Страница 2: ...5 01 Date of issue 05 01 Copyright 1999 NEW LIFT Steuerungsbau GmbH All rights including those of copying and reproduction of parts of this de scription and of the translation are reserved by the publ...

Страница 3: ...1 Working principle 9 3 2 LEDs and terminals 10 3 3 Dimensions and technical data 12 4 Installation and Commissioning 15 4 1 Mounting and Wiring the A6 Safety Monitoring Device 16 Mounting the A6 Safe...

Страница 4: ...Contents 4 A6_BA EN05 01...

Страница 5: ...an of the A6 Safety Monitoring Device and the lift system Local national and on site regulations regarding health and safety and pro tection of the environment must be taken into account in addition t...

Страница 6: ...d The following signs and symbols are used Symbol Activity Symbol Activities described after this symbol must be carried out in the given or der Warning sign High voltage This sign marks activities wi...

Страница 7: ...n must be followed in addition to the safety regulations mentioned in this manual 2 1 Intended Use The A6 Safety Monitoring Device according to EN 81 1 2 14 1 2 3 and TRA 264 2 is only intended for us...

Страница 8: ...sufficient strain relief Working in the shaft When using the car for an assembly platform regulations from VGB 35 Building hoists apply for the entire lift system Troubleshooting and Servicing The A6...

Страница 9: ...2 1 2 and TRA 265 1 Ramp control according to EN81 1 14 2 1 5 EN81 2 14 2 1 4 and TRA 266 3 The A6 Safety Monitoring Device is used to override the door and locking switches safety switches in the unl...

Страница 10: ...er and closes the contacts to override the door and locking switches If the car leaves the unlocking zone or the controller does not enable the zone circuit the zone signal and the door and locking sw...

Страница 11: ...r shutting down the system input 502 Error signal for shutting down the system output 503 Override door locking equipment input 504 Override door locking equipment output 505 External error signal iso...

Страница 12: ...ortant Facts about your A6 Safety Monitoring Device 12 A6_BA EN05 01 3 3 Dimensions and Technical Data Dimensions Abb 3 3 Dimensions of the A6 Safety Monitoring Device A6004 cdr top hat rail m ounting...

Страница 13: ...ue Unit Signal voltage 24 10 V DC Power consumption 200 mA Fusing the safety circuit C2 Output limits Voltage 250 V Current 4 A Capacity 800 VA Length x width x height 100 x 75 x 110 mm Temperature ra...

Страница 14: ...3 Important Facts about your A6 Safety Monitoring Device 14 A6_BA EN05 01 Notes...

Страница 15: ...by NEW LIFT it is delivered in the wired controller cabinet and installation is to be carried out following the instructions of your lift controller Abb 4 1 Recommended order of installation and commi...

Страница 16: ...Device is snapped onto a top hat rail DIN EN 50022 in the controller cabinet or fastened to the supporting plate with two screws See fig Dimensions of the A6 Safety Monitoring Device on page 12 Wiring...

Страница 17: ...Installation and wiring of the A6 Safety Monitoring Device and sensors A and B completed Sensor switching points The sensor switching points must be adjusted so that in the zone area sen sor A is clos...

Страница 18: ...connect terminal 516 sensor A The zone error LED must illumi nate within 1 second maximum while the car is moving Disconnect terminal 515 sensor B while the car is still at rest then start moving the...

Страница 19: ...on are met and the A6 Safety Monitoring Device is still malfunctioning it must be replaced The replaced A6 Safety Monitoring Device must be returned to NEW LIFT The A6 Safety Monitoring Device must no...

Страница 20: ...5 Troubleshooting and Servicing 20 A6_BA EN05 01 Notes...

Страница 21: ...6 Declarations of Conformity A6_BA EN05 01 21 6 Declarations of Conformity...

Страница 22: ...e elektromagnetische Vertr glichkeit 89 336 EWG ge ndert durch 93 31 EWG Zur Beurteilung der Sicherheitsschaltung wurden folgende Normen herangezogen Aufzugsrichtlinie 95 16 EG EN 81 1 1998 EN 81 2 19...

Страница 23: ......

Страница 24: ...Your NEW LIFT Hotline e mail hotline newlift de Lochhamer Schlag 8 Tel 49 0 89 8 98 66 1 10 D 82166 Gr felfing Fax 49 0 89 8 98 66 3 00...

Отзывы: