- 98 -
www.NewLeader.com
(800) 363-1771
312521-AA-C
NL4258/4330G4 EDGE
•
Using the control buttons
(Reset,
Run, Stop), run a catch test� If spreading product that
has already been tested, press
to continue� To
begin a test, press
� Conveyor will run�
•
Once controller dispenses specific amount,
conveyor will stop� Press
to continue�
•
Weigh material dispensed and enter actual
weight of material dispensed� Press
to continue�
• It is recommended a minimum of three (3) tests be
done PER PRODUCT to ensure accuracy� Once
each test is done, press “Repeat Calibration” to
run a subsequent test. When finished, press
�
• The main Calibration screen will appear� To
calibrate with a known amount brought to a field,
press
�
Note:
Field totals can be reset from Summary
Screen if needed�
Controller Operations
Содержание AGCO NL4258
Страница 6: ...Insert Current New Leader Warranty Warranty...
Страница 41: ...41 NL4258 4330G4 EDGE www NewLeader com 800 363 1771 312521 AA C Insert Installation Single Bin...
Страница 42: ...42 www NewLeader com 800 363 1771 312521 AA C NL4258 4330G4 EDGE Insert Installation MultApplier...
Страница 44: ...44 This page is intentionally left blank www NewLeader com 800 363 1771 312521 AA C NL4258 4330G4 EDGE Notes...
Страница 54: ...54 This page is intentionally left blank www NewLeader com 800 363 1771 312521 AA C NL4258 4330G4 EDGE Notes...
Страница 78: ...78 This page is intentionally left blank www NewLeader com 800 363 1771 312521 AA C NL4258 4330G4 EDGE Notes...
Страница 106: ...106 www NewLeader com 800 363 1771 312521 AA C NL4258 4330G4 EDGE Notes This Page Intentionally Left Blank...