Engine - Engine and crankcase
4. Connect the lift chain to a suitable lifting device.
5. Carefully lift the engine above the combine and lower
into position into the frame.
NOTE:
Illustration is for reference only. It may not be the
actual engine.
NOTE:
The lifting device should be rated for at least
907.2 kg
(
2000 lb
). Allow enough clearance to lift the en-
gine from the combine, approximately
907.2 kg
(
2000 lb
)
from the floor.
10013136
4
6. For safety reasons to the radiator, place a sheet of ply-
wood, cut to size, in front of the radiator for protection.
7. Slide the engine towards the gearbox onto the gear box
input shaft.
8. Align the holes of the gearbox with the engine and hand
start a cap screw
(1)
on each side of the coupling, going
back and forth until all cap screws are installed.
86070283
5
9. With the engine positioned in the frame, align the two
front mounting holes on the grain tank side. Install the
mounting hardware
(1)
into the mount. Do not tighten
yet.
NHIL15CR00055AA
6
_47865347 25/04/2015
10.1 [10.001] / 14
Содержание CR8.90
Страница 8: ..._47865347 25 04 2015 Find manuals at https best manuals com ...
Страница 9: ...INTRODUCTION _47865347 25 04 2015 1 Find manuals at https best manuals com ...
Страница 78: ..._47865347 25 04 2015 10 2 10 202 14 ...
Страница 81: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com ...