background image

2

www.edenarbors.com 

1

Lay out the top rail

,

 

b

ottom rail

,

 horizontal spindles

,

 and

vertical spindles as shown. Start 

b

y inserting the 7 vertical

spindles into the 3 horizontal rails.

Note

 that the routed holes on the horizontal rails are slightly

offset from the centre. Ensure that the holes are aligned as per

the inset image.

Continue to inser

ttheassembly

into the top and 

b

ottom

 

rails.

 

Ensure that the vertical spindle notched end

s

 are fully  inserted 

into the top/bottom rails, just past the notched end

s

.

 

Note

 the difference 

b

etween the two rails. The 

b

ottom rail

 

only 

has one routed side whereas the top rail has additional

 

holes 

for the arch spindles.

Align and insert the rails into one of the post. 

Note

 that the pre-drilled holes are located on t

he ba

ck side

of the trellis. 

Proceed with the other post.

Flip the trellis over and using the provided screws

,

 fasten

the posts to the top and 

b

ottom rails in place as shown.

1

2

3

4

STEP ONE

2

3

NOTE:  Assembly will be easier if performed by two people

Note orientation

5

5

The Vienna Trellis

Содержание Vienna

Страница 1: ... Extensions 2 10888 15 1 1 2 38 mm Self Auguring Stainless Steel Screws 20 20005 Tools You Will Need Cordless Drill Hammer Tape Measure Level Shovel General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 5 x 8 1 5mx2 4m for unobstructed assembling Y...

Страница 2: ...notched ends are fully inserted into the top bottom rails just past the notched ends Note the difference between the two rails The bottom rail only has one routed side whereas the top rail has additional holes for the arch spindles Align and insert the rails into one of the post Note that the pre drilled holes are located on the back side of the trellis Proceed with the other post Flip the trellis...

Страница 3: ...he arches will be marked with a sticker where they meet the keystone Using two of the provided screws fasten the arches into the keystone insert as shown Drive two more screws to the underside of the keystone Snap the top and bottom lid to complete the arch assembly Arch Assembly 1 Insert first 2 3 4 1 2 3 4 Sticker Sticker The Vienna Trellis ...

Страница 4: ... rail as shown The short spindles would be on the outer side of the rail and the long spindles would be on the inner side of the rail Starting on one end guide the arch assembly and arch spindles into the pre routed holes as shown Fasten the arch assembly to the posts using four screws 2 per post provided Arch Assembly 1 2 3 4 1 Long 2 Long Short Short 3 4 The Vienna Trellis ...

Страница 5: ...posts and 24 61cm into the ground A B C Mounting Into the Ground Trellises must be well secured in the event of high winds etc We have provided two ground mounting extensions for securing the trellis either into the ground or into a concrete footing If you are installing your trellis directly to the wall of your home or on a wood deck or concrete surface please see your hardware store for the appr...

Отзывы: