background image

Tools You Will Need

Cordless Drill

• Hammer

 Tape Measure

Level

Stool or Short Ladder

Shovel

General Information

Read Instructions through carefully before beginning assembly.

 When assembling components, place on a non-abrasive surface

(i.e. shipping box)

 to avoid scratching.

We recommend an area approx 10’x 8’

 (3 m x 2.4 m)

 for unobstructed assembling.

You should not need to use excessive force when assembling components.

Please read through before starting assembly.

1.

Arch Keystone 

(10836)

 & Top Lid 

(10668-1)

 

& Keystone Insert 

(10837)

 -

(2 of each) 

2.

Keystone Bottom Plate 

(2)

 - 

10666-1

3.

Arches 

(4)

 

(2 ea. Right 10671-1 , 2 ea. Left 10670-1) 

4.

Arch Rafters 

(8)  

10672-1

5.

Post Caps 

(4)

 - 

( 2 ea. Right 10674-1 & 2 ea. Left 10673-1)

6.

Posts 

(4) 

-

10791

7.

Side Panel Horizontal Rails 

(4)

 - 

10833

8.

Lattice (

2)

 

10780

9.

Hardware 

(in plastic bag)

a)

1 1/2” 

(38 mm) 

Self-Auguring Screws 

(

24)

 -

 20005

b)

3” 

(76 mm) 

Self-Auguring Screws 

(16 

-

 20007

10.

Ground 

Mounting Extensions 

(4) 

10844

ASSEMBLY INSTRUCTIONS

The Livingston Arbor / Arch

8

6

1

5

4

3

1

9 a

Not to Scale

10

IMPORTANT:  CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.

Check Box for These Contents 

In the event of missing or defective parts please call our customer service dept. at 

1 800 282 9346

 (Mon. to Fri. 8:00 AM to 4:00 PM EST).

(UK Tel: 

(44) 2038 687160 

- Mon. to Fri. 1:00 PM to 10:00 PM GMT).

2

b

91.5 in

(232 cm)

42 in

(107 cm)

49 in

(124 cm)

20 in

(51 cm)

24 in

(61 cm)

V2.

2

/

081817

7

www.newenglandarbors.com

www.newenglandarbors.co.uk

Содержание Livingston Arbor

Страница 1: ...t 10670 1 4 Arch Rafters 8 10672 1 5 Post Caps 4 2 ea Right 10674 1 2 ea Left 10673 1 6 Posts 4 10791 7 Side Panel Horizontal Rails 4 10833 8 Lattice 2 10780 9 Hardware in plastic bag a 1 1 2 38mm Self Auguring Screws 24 20005 b 3 76mm Self Auguring Screws 16 20007 10 Ground Mounting Extensions 4 10844 ASSEMBLY INSTRUCTIONS The Livingston Arbor Arch 8 6 1 5 4 3 1 9 a Not to Scale 10 IMPORTANT CHEC...

Страница 2: ...he arches to the bottom of the keystone insert with two of the 1 1 2 38 mm through the two pre drilled holes on the bottom insert tabs Seal the bottom hole on the keystone by inserting the bottom plate as provided Install the top cap on the arch keystone Push down firmly so the cap locks into position Repeat for other arch Insert arch rafters 8 into the holes on the arches until they bottom out in...

Страница 3: ...nside the posts secure them in place using eight 3 76mm screws as shown Repeat for other side panel 1 The Livingston Arbor Arch Assemble theSide Panels 2 3 4 5 6 1 Insert the assembled arch into the top of all four posts until the arch bottoms rest on top of the stopper bolts You will need a helper Pull the post caps down into final position over the posts and fasten the arch system to the posts b...

Страница 4: ... into the bottom of each post with two 1 1 2 38 mm screws as shown The ground mounting extensions should extend 12 off the bottom of the post Carefully move the arbor back into position and level it both vertically and horizontally Backfill the holes with the excavated soil to cover the anchors 1 Temporary Arbor Installation 2 3 Arbors must be well secured to prevent tipping over from wind load et...

Отзывы: