
6.1.4 Unpacking the package should refer to the following instructions as Figure 3, Any rude
operation or use crowbar unclench into the boxes are prohibited. Pay attention to personal safety
and modules safety when using tools.
6.1.5 After unloading, the packing box shall be placed on dry and flat ground, and
shall not be placed on wet, muddy and uneven ground;
6.1.6 After the modules are transported to the construction site, the upper and lower
boxes shall be separated and placed separately, and the two boxes of modules shall
not be stacked; if the modules cannot be installed in time, attention shall be paid to
the protection of modules and packing boxes to prevent the damage of natural
disasters such as rain, snow, hail, typhoon, etc.
Unpacking paper boxes process
1. d dismantling the packing belt of the
coaming, the red tape is not dismantled.
2. remove packaging side (shaded part).