GUANGDONG NEW ENERGY TECHNOLOGY DEVELOPMENT CO.,LTD.
ADD: No.66-68 Fengshen Avenue, Huadu District, Guangzhou City, CN
WEB: www.ne01-e.com
9
The minimum conductor cross-section
Rated current/A
cross-section/mm
≤0.2
tinsel cordª
>
0.2&≤3
0.5ª
>
3&≤6
0.75
b
>
6&≤10
1.0(0.75)
b
>
10&≤16
1.5(1.0)
>
16&≤25
2.5
>
25&≤32
4
>
32&≤40
6
>
40&≤63
10
A. The length of the wire and the wire protective sleeve is less than 2m that can use this type of wire.
B. Wire length is no more than 2m, the portable appliance values in parentheses can be used
Users are not allowed to change the power cord or socket. Wiring work must be carried out by a qualified
electrician and ensure that the metal part of the machine has a good grounding. Changing the ground
mode is strictly forbidden.
After the completion of the construction of all wiring work, please make sure to recheck everything is well
before power on.
Installing the machine in the warehouse which the combustible gas may leak is strictly forbidden.
Do not put your hands or foreign objects into the air outlet of heat pump unit, otherwise, it will be
dangerous to the people and equipment.
In order to obtain a better energy-saving effect, the unit should be installed in a place with good air
circulation.
Water used for this machine must be accordance with the national standard of living water, otherwise, if
the machine is damaged, we will not assume any responsibility.
When do power connection, must be equipped with all-pole disconnect device and leakage protection
device which match the unit and have at least 3mm contact opening distance from power; If the power
cord is damaged, in order to avoid dangerous, must be replaced by a professional manufacturer, its
service department or similar departments.