background image

   35 

New Brunswick Scientific 

 

User’s Guide 

 

Figure 8:  Voltage Selector Card Indicator Pin & Alignment Arrow 

 

 
 

 

 

6.3 Fusing 

Arrangement 

 

If you change the voltage on your Innova shaker, it may also be necessary to modify 
the fusing arrangement.  If so, please follow the appropriate procedure below. 

 

6.3.1 

Single to Double Fuse Conversion  

 

1.  Open the cover of the power module using a small blade screwdriver and 

remove the cover/fuse block assembly 

(see Figure 6, repeated below for 

easy reference)

 

Figure 6:  Power Module/Fuse Block 

 

 

Содержание Innova 2000

Страница 1: ...0050 Revision P January 19 2004 NEW BRUNSWICK SCIENTIFIC CO INC BOX 4005 44 TALMADGE ROAD EDISON NJ 08818 4005 Telephone 1 732 287 1200 1 800 631 5417 Fax 732 287 4222 Telex 4753012 NBSCO Internet ht...

Страница 2: ...2 M1190 0050 Innova 2000 2050 User s Guide...

Страница 3: ...1265 Zhongshan Road W Shanghai 200051 P R China Tel 86 21 3223 0203 Fax 86 21 6278 7182 E mail nbschc online sh cn THE NETHERLANDS New Brunswick Scientific BV Kerkenbos 1101 6546 BC Nijmegen P O Box...

Страница 4: ...4 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE INTENTIONALLY BLANK...

Страница 5: ...ersonal injury can occur Please read the entire User s Guide before attempting to use this unit Do not use this equipment in a hazardous atmosphere or with hazardous materials for which the equipment...

Страница 6: ...6 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE INTENTIONALLY BLANK...

Страница 7: ...e right to change information in this document without notice Updates to information in this document reflect our commitment to continuing product development and improvement Manual Conventions NOTE C...

Страница 8: ...8 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE INTENTIONALLY BLANK...

Страница 9: ...and our obligation under this warranty is limited to repairing or replacing the instrument or part thereof which shall with in 1 year after date of shipment prove to be defective after our examinatio...

Страница 10: ...10 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE INTENTIONALLY BLANK...

Страница 11: ...PTIONS 21 2 6 1 Temperature Monitor Option 21 2 6 2 Capacity Upgrade Option 21 3 UNPACKING INSTALLATION 23 3 1 UNPACKING 23 3 2 VERIFYING VOLTAGE CONFIGURATION 23 4 INSTALLATION 25 4 1 LOCATION 25 4 2...

Страница 12: ...MBLY 39 6 8 MAINT INDICATOR 40 6 9 TEMPERATURE MONITOR OPTION 41 6 9 1 ESD Precautions 41 6 9 2 Installing the Temperature Monitor Option 42 6 10 CAPACITY UPGRADE OPTION 43 6 10 1 Installing the Capac...

Страница 13: ...and maintenance free operation that is characteristic of all NBS shakers The Innova 2000 2050 incorporates a variety of state of the art components and features to permit the precision operation nece...

Страница 14: ...14 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE IS INTENTIONALLY BLANK...

Страница 15: ...our to 99 9 hours A Temperature Monitoring option is available for the measurement display and documentation of sample temperature The Innova 2000 2050 is equipped with audible and visible alarms that...

Страница 16: ...ator interface The keypad has four keys marked START STOP S T and SELECT A three digit LED display provides numeric values as well as some letter codes There are four function indicator and four statu...

Страница 17: ...uring normal shaker operation the display will indicate Shaker status on off Shaking speed Setpoints Hours remaining timed run Measured temperature when Temperature Monitor option is installed 2 2 2 U...

Страница 18: ...ours of use Accumulated running time is internally monitored and may be displayed as a guideline SET Indicates that the shaker is in the SET mode setpoints are being displayed and can be altered TIME...

Страница 19: ...ings minimize the generation of airborne particulates that could be disadvantageous in clean rooms or controlled environment areas These bearings require no maintenance 2 4 2 Motor Innova 2000 and 205...

Страница 20: ...shaker control as well as recognition of an expansion connector for option modules Provides an operator interface via displays audible alarm and connection to the keypad module keypad buttons and dis...

Страница 21: ...ature can be documented The analog output for shaking speed is 0 5V 1V per 100 RPM For temperature the output is 0 5V 0 05V per C The output can also be connected to a data logging computer with an an...

Страница 22: ...22 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE IS INTENTIONALLY BLANK...

Страница 23: ...voltage selector and the label on the rear of the unit and confirm that the correct electrical service package is included with the unit by comparing the part number on the package to Table 4 below s...

Страница 24: ...24 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE IS INTENTIONALLY BLANK...

Страница 25: ...ovide the necessary space for your shaker in operation before you install it The dimensions provided include a platform but do not include glassware Table 5 Operating Space Requirements Dimensions Spa...

Страница 26: ...the four knob screw shafts Be sure to use a platform of the proper size for your particular shaker 2 Tighten the four knobs to secure the platform 4 4 Installing Optional Flask Clamps If you have pur...

Страница 27: ...ew S2116 3101 5 3 4 19 05 mm thick wood platform 10 24 x 5 16 7 9 mm flat Phillips head screw S2116 3051 5 5 16 7 9 mm thick aluminum phenolic and stainless steel platforms 10 32 x 5 16 7 9 mm flat sl...

Страница 28: ...er s Guide Figure 5 2 to 6 Liter Clamp Installation NOTE Figure 5 is also valid for 2800 ml Fernbach Flask Clamps UPPER GIRDLE WITH GIRDLE TUBES LOWER GIRDLE WITH GIRDLE TUBES PLATFORM CLAMP MOUNTING...

Страница 29: ...inates 3 Press either the S or T key to enter SET mode SET indicator will light 4 Set the speed by pressing the S or T key until the desired setpoint is displayed Holding the S or T key down will caus...

Страница 30: ...o stop the alarm press the SELECT key and change to any other function To cancel the timer WITHOUT stopping the shaker 1 Press the SELECT key until the HRS indicator is illuminated 2 Press either S or...

Страница 31: ...be displayed in hundreds of hours i e 02 equals 200 hours 102 equals 10 200 hours This display will continue for 10 seconds and then default to the previous mode readout After 10 000 hours of operatio...

Страница 32: ...any attempt to enter a temperature setpoint results in Err Error being displayed 5 8 Cleaning Maintenance The unit may be cleaned using a damp cloth or any standard household or laboratory cleaner to...

Страница 33: ...the fusing arrangement referring to Figure 6 1 Always disconnect the unit from the power source first 2 Using a small screwdriver remove the cover fuse block located on the rear panel 3 Remove the ol...

Страница 34: ...g each edge of the voltage selector card the voltage options are printed in large numbers 100 120 220 240 Place the card in front of you with the desired voltage printed at the bottom see Figure 7 5 W...

Страница 35: ...ur Innova shaker it may also be necessary to modify the fusing arrangement If so please follow the appropriate procedure below 6 3 1 Single to Double Fuse Conversion 1 Open the cover of the power modu...

Страница 36: ...and lifting it off the pedestal see Figure 9 Figure 9 Fuse Block Cover Assembly 4 Invert the fuse block and slide it back onto the Phillips screw and pedestal Tighten the Phillips screw 5 Verify the c...

Страница 37: ...atform off 2 Remove the foam pad 3 Remove the nine screws that hold the subplatform in place three screws around each of the bearings 4 Lift the upper housing straight up and clear the bearing retaine...

Страница 38: ...by applying a slight finger pressure to the belt midway between the two pulleys The belt should deflect approximately 3 8 inch 9 5 mm 5 If belt tension needs adjustment proceed to Section 6 5 1 below...

Страница 39: ...of each retainer will protrude through the housing Figure 13 Bearing Housing Retainers 4 Reinstall the nine screws securing them evenly but do not tighten them yet 5 Rotate the bearing housing by hand...

Страница 40: ...assembly 7 Guide the belt onto the pulley grooves Using a straight edge across the pulleys adjust the height of the motor pulley so the belt is parallel to the base 8 Tighten the set screw in the mot...

Страница 41: ...The package does not include a chart recorder Before scheduling the Service Engineer for field installation it is a good idea to confirm against the packing list that you have received all the parts 6...

Страница 42: ...the shaker platform and subplatform see Section 6 4 Figure 15 Front Panel Assembly 4 Remove the five screws that hold the front panel in place Lay the front panel on its face 5 Remove three nuts and t...

Страница 43: ...ecorder cable s 10 pin connector to J104 on the temperature control module 15 Carefully put the front panel back in place and secure it with screws 16 Place the unit on its side 17 Mount the RTD brack...

Страница 44: ...ottom of the large pulley by inserting the 1 4 20 screw through each counterweight s mounting hole Figure 16 Counterweight Pulley Assembly 4 Hold the counterweights and tighten the screw sufficiently...

Страница 45: ...r 500 ml Erlenmeyer flasks AG2 TA25 18 Test Tube Rack Slant All above platforms constructed of stainless steel 7 2 Innova 2050 Platforms NBS Part Number Number of Clamps Description 12 x 16 in 30 5 x...

Страница 46: ...All above clamps constructed of stainless steel 7 4 Service Parts Model NBS Part Number Description Quantity P0380 3830 0 200A Fuse 1 P0380 3410 1 0A 5x20 mm Fuse 1 EF 104 1 0A 3AG Fuse 1 P0420 1610 1...

Страница 47: ...8 inches 9 5 mm AUTOMATIC RESTART Automatic restart after power is restored indicated by flashing display SETPOINT RETENTION All setpoints and operating status are retained in non volatile memory DRIV...

Страница 48: ...ndicates speed running time alarm conditions and displays readout of internal clock actual accumulated operating time Character height 3 8 inches 9 5 mm AUTOMATIC RESTART Automatic restart after power...

Страница 49: ...entific User s Guide NOTE At 25 400 RPM the unit will perform to specifications with up to 10 line voltage fluctuation To attain speed accuracy at 401 500 RPM the line voltage cannot be lower than 5 o...

Страница 50: ...50 M1190 0050 Innova 2000 2050 User s Guide THIS PAGE IS INTENTIONALLY BLANK...

Страница 51: ...51 New Brunswick Scientific User s Guide 9 9 D DR RA AW WI IN NG GS S Figure 17 Control Schematic...

Страница 52: ...9 Fuse Block Cover Assembly 36 10a Double Fuse Arrangement 36 10b Single Fuse Arrangement 36 11 Subplatform Cutaway 37 12 Drive Belt Replacement Adjustment 38 13 Bearing Housing Retainers 39 14 Motor...

Страница 53: ...Continuous Run 29 Control Panel 16 17 Control Schematics 51 Conversion 2000 to 2050 21 Converting Innova 2000 to 2050 43 Copyright Notice 7 Counterweight Pulley Assembly 44 D Dimensions 25 Disclaimer...

Страница 54: ...ssor Controller 15 Platforms 15 19 23 Innova 2000 45 Innova 2050 45 Installation of 26 Power Entry Module 33 35 Powering Up 29 R Rear View 16 Remote Monitoring 20 41 Replacement Partd 46 Replacing a F...

Страница 55: ...ng Time 31 Troubleshooting 33 U Universal Power Module 16 26 Unlimited Run 29 Unpacking 23 User Interface Keys 18 V Vessel Temperature Measuring a 32 Voltage Changing the 34 Voltage Configuration 23 2...

Отзывы: