NVF-200SE/PD Power over VDSL Master/Slave USER’S MANUAL Ver. B.4
12
Notes:
1.
Be sure each twisted-pair cable (RJ-45) does not exceed 100 meters (328 feet).
2.
Line port must use 22 ~ 26 gauge phone wiring, we do not recommend 28 gauge or above.
3.
We advise using Category 3, 4, 5 cables for cable bridge or router connections to avoid any confusion or
inconvenience in the future when you attached to high bandwidth devices.
4.
Be sure phone wiring has been installed before NVF-200SE and NVF-200PD powered on.