NETGEAR ReadyNAS RR4360S Скачать руководство пользователя страница 3

3

Package Contents

Important

: Read all safety warnings in the hardware manual for your system before connecting 

the system to the power supply.

Your package contains the following items:

•  RR4360 chassis including 60 disk trays
•  Rack mount rail kit
•  Cable management kit
•  Ten Power cords. (Five sets of two power cords for the two supplied power supplies. Each 

set for a different region.)

•  Ethernet cable
•  60 screws to optionally screw the disk trays to the disks

Prepare the Installation Site

Keep the following considerations in mind as you install your unit:

•  Ambient operating temperature

. If the unit is installed in a closed or multi-unit rack 

assembly, the ambient operating temperature of the rack environment might be greater 
than the ambient temperature of the room. Therefore, consider installing the equipment in 
an environment compatible with the maximum rated ambient temperature.

•  Reduced airflow

. Mount the equipment into a rack so that the amount of airflow required 

for safe operation is not compromised.

•  Mechanical loading

. Mount the equipment into a rack so that a hazardous condition does 

not arise due to uneven mechanical loading.

•  Circuit overloading

. Consider the equipment’s connection to the power supply circuitry 

and the effect of possible overloading of circuits on overcurrent protection and power 
supply wiring. Consider equipment nameplate ratings when addressing this concern.

•  Reliable ground

. This product requires that a reliable ground be maintained at all times. 

To ensure this, ground the rack itself. Pay particular attention to power supply connections 
other than the direct connections to the branch circuit (for example, the use of power 
strips).

•  Setup location

. This product is intended for installation in a restricted access location 

(dedicated equipment rooms, service closets, and the like) only.

•  Front clearance

. Leave enough clearance in front of the rack (about 64 cm or 25 inches) 

to enable you to open the front door completely and in the back of the rack (about 76 cm 
or 30 inches) to allow for sufficient airflow and ease in servicing.

•  Rear rack clearance

. This product requires nearly the full depth of the rack. Placement of 

items such as a power strip inside the rack might block the product from being completely 
pushed in.

Содержание ReadyNAS RR4360S

Страница 1: ...Installation and Quick Start ReadyNAS RR4360S RR4360X...

Страница 2: ...kage Contents 3 Prepare the Installation Site 3 Install the System in a Rack 4 Precautions 4 Rack Installation 5 Install Cable Management 6 Install Disks 7 Basic Setup 9 Reformat Disks 10 Additional I...

Страница 3: ...ng Mount the equipment into a rack so that a hazardous condition does not arise due to uneven mechanical loading Circuit overloading Consider the equipment s connection to the power supply circuitry a...

Страница 4: ...ions Ensure that the leveling jacks on the bottom of the rack are fully extended to the floor with the full weight of the rack resting on them In single rack installations attach stabilizers to the ra...

Страница 5: ...e chassis insert the hooks in the front surface of the outer rail into holes in the front of the rack and press the rail down to fasten it to the rack 8 Repeat with the right rail and right side of th...

Страница 6: ...t hardware 1 Attach the rack bracket to the arm assembly using three bolts 2 Attach the chassis bracket to the bracket on the left rear of the RR4360 chassis using two bolts 3 Attach the rack bracket...

Страница 7: ...imal RAID mode and level are automatically selected for you based on the number of disks that are installed If desired you can later change the RAID settings manually For information about RAID settin...

Страница 8: ...es in your drive Note The following figure illustrates how disk numbers are assigned based on their position in the chassis When you reinsert the drive and tray into a slot the weight of the drive sea...

Страница 9: ...supplies 4 Use an Ethernet cable to connect an Ethernet port on the storage system to your network 5 If necessary press the Power button to turn on the system 6 Wait for the Power LED to turn solid bl...

Страница 10: ...manual for your system 3 Press and hold the Reset button 4 Press the Power button The system powers on 5 Continue pressing the Reset button for about five seconds until the system enters the boot menu...

Страница 11: ...cefully power off your storage system 1 Press the Power button on the front panel of the system The Power LED blinks prompting you to confirm the shutdown 2 Press the Power button again The system shu...

Страница 12: ...er manuals and join our community We recommend that you use only official NETGEAR support resources Trademarks NETGEAR Inc NETGEAR and the NETGEAR Logo are trademarks of NETGEAR Inc Any non NETGEAR tr...

Отзывы: