ReadyNAS 3200, 4200 v1, 4200 v2
35
NETGEAR ReadyNAS Rack-Mount Storage Systems
Installation
Read these instructions in their entirety before you begin. Locate the shipping carton, remove
the rack-mounting kit, and prepare to work with it.
The rack-mounting kit contains two rail assemblies. Each assembly consists of two sections:
•
An inner fixed chassis rail that secures directly to the unit’s chassis.
•
An outer fixed rack rail that secures directly to the rack itself.
To install the system into a rack:
1.
Extend the rail assembly by pulling it outward.
2.
Press the release tab and separate the inner rail from the outer assembly.