8
2
2.
Hardware Installation
This chapter explains how to install the hardware for the ProSafe™ 24-Port Managed Switch
JGSM7224.
Package Contents
The switch is packed and shipped separately. The package contains the following items:
•
Managed Switch with preinstalled software
•
Power adapter cord
•
Rubber footpads for tabletop installation
•
Rubber caps for the SFP sockets
•
Rack-mounting kit
•
Null-modem serial console cable (RS-232) with 9-pin connectors
•
Resource CD
: The CD contains documentation including the Installation Guide, and link
to the
ProSafe JGSM7224 Managed Switch CLI Reference Manual
and the
ProSafe
JGSM7224 Managed Switch Reference Manual
.
•
Installation Guide
Protecting Against Electrostatic Discharge
WARNING!
Static electricity can harm delicate components inside your
system. To prevent static damage, discharge static electricity
from your body before you touch any of the electronic
components, such as the microprocessor. You can do so by
periodically touching an unpainted metal surface on the switch.
You can also take the following steps to prevent damage from electrostatic discharge (ESD):