NETGEAR GC510P Скачать руководство пользователя страница 23

Step 1: Prepare the Site

Before you install the switch, make sure that the operating environment meets the site requirements that
are listed in the following table.

Table 5. Site requirements

Requirements

Characteristics

Desktop installations. Provide a flat table or shelf surface.

Wall installations. Use the wall-mount screws that are supplied with the switch to attach the
switch to a wall.

Pole (or other surface) installations. Use an off-the-shelf 75 mm VESA standard mount
to secure the switch to a pole or another surface. The bottom panel of the switch provides
four mount holes that are VESA-compliant.

Rack-mount installations. Use a 19-inch (48.3-centimeter) EIA standard equipment rack
that is grounded and physically secure. You also need the rack-mount kit that is supplied
with the switch.

Mounting

Locate the switch in a position that allows you to access the front panel ports, view the front
panel LEDs, and access the power connector on the back panel.

Access

Use the AC power cord that is supplied with the switch. Make sure that the AC outlet is not
controlled by a wall switch, which can accidentally turn off power to the outlet and the switch.

Power source

Route cables to avoid sources of electrical noise such as radio transmitters, broadcast
amplifiers, power lines, and fluorescent lighting fixtures.

Cabling

Temperature. Install the switch in a dry area with an ambient temperature between 32ºF
and 122ºF (0ºC and 50ºC). Keep the switch away from heat sources such as direct sunlight,
warm-air exhausts, hot-air vents, and heaters.

Operating humidity. The maximum relative humidity of the installation location must not
exceed 90 percent, noncondensing.

Ventilation. Do not restrict airflow by covering or obstructing air inlets on the sides of the
switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. The room or
wiring closet in which you install the switch must provide adequate airflow.

Operating conditions. Keep the switch at least 6 feet (1.83 meters) away from the nearest
source of electromagnetic noise, such as a photocopy machine.

Environmental

Step 2: Protect Against Electrostatic Discharge

WARNING:

Static electricity can harm delicate components inside your system.To prevent
static damage, discharge static electricity from your body before you touch
any of the electronic components, such as the microprocessor. You can do
so by periodically touching an unpainted metal surface on the switch.

You can also take the following steps to prevent damage from electrostatic discharge (ESD):

Installation

23

Insight Managed 8-Port Gigabit Ethernet PoE+ Smart Cloud Switch with 2 SFP Fiber Ports

Содержание GC510P

Страница 1: ...ht Managed 8 Port Gigabit Ethernet PoE Smart Cloud Switch with 2 SFP Fiber Ports Hardware Installation Guide Models GC510P and GC510PP September 2017 202 11780 02 350 E Plumeria Drive San Jose CA 9513...

Страница 2: ...EU Declaration of Conformity visit http kb netgear com app answers detail a_id 11621 Compliance For regulatory compliance information visit http www netgear com about regulatory See the regulatory co...

Страница 3: ...r 4 Installation Step 1 Prepare the Site 23 Step 2 Protect Against Electrostatic Discharge 23 Step 3 Unpack the Switch 24 Step 4 Install the Switch 25 Install the Switch on a Flat Surface 25 Wall Moun...

Страница 4: ...5 Troubleshooting Troubleshooting Chart 35 PoE Troubleshooting Suggestions 36 Additional Troubleshooting Suggestions 36 4 Insight Managed 8 Port Gigabit Ethernet PoE Smart Cloud Switch with 2 SFP Fibe...

Страница 5: ...ximum PoE power budget Model GC510P This model can supply up to 30W PoE IEEE 802 3at to each port with a maximum PoE power budget of 134W across all active PoE ports Model GC510PP This model can suppl...

Страница 6: ...ay Zero window add the switch from the Network window or add the switch from the Device List window For more information see the NETGEAR knowledge base articles at support netgear com Local browser ba...

Страница 7: ...it for rack mount installation in a standard 19 inch rack Full compatibility with IEEE standards IEEE 802 3 Ethernet IEEE 802 3u 100BASE T IEEE 802 3ab 1000BASE T IEEE 802 3z Gigabit Ethernet 1000BASE...

Страница 8: ...s and Warnings Use the following safety guidelines to ensure your own personal safety and to help protect your system from potential damage To reduce the risk of bodily injury electrical shock fire an...

Страница 9: ...Eastern countries such as South Korea and Taiwan 100V 50 Hz in eastern Japan and 100V 60 Hz in western Japan 230V 50 Hz in most of Europe the Middle East and the Far East Be sure that attached device...

Страница 10: ...ver Be sure that nothing rests on any cables Do not modify power cables or plugs Consult a licensed electrician or your power company for site modifications Always follow your local and national wirin...

Страница 11: ...2 Hardware Overview This chapter describes the switch hardware features The chapter includes the following sections Hardware Description Switch Hardware Interfaces 11...

Страница 12: ...1 Front panel Back Panel Both model GC510P and model GC510PP provide eight 10 100 1000BASE T RJ 45 PoE ports and two dedicated Gigabit SFP fiber ports Both models integrate a fixed internal power sup...

Страница 13: ...n lock for an optional security cable 6 LEDs This section describes the LED designations of the switch Table 2 LEDs on the back panel Description LED Solid blue The switch is connected to the cloud se...

Страница 14: ...s set up to be managed by the NETGEAR Insight app Off The switch is not connected to the cloud server or is set up to be managed by the local browser interface Cloud Connection LED Solid green The swi...

Страница 15: ...n the following table Table 4 Supported SFP transceiver modules Description Model Speed and Medium SFP transceiver 1000BASE SX AGM731F 1G Ethernet short reach fiber SFP transceiver 1000BASE LX AGM732F...

Страница 16: ...nds The switch restarts and returns to the most recently saved cloud managed configuration During this process the Power LED lights amber Return the switch to its factory default settings After you us...

Страница 17: ...k connections The switch can be used as your only network traffic distribution device for PoE PoE and non PoE devices or with 10 Mbps 100 Mbps and 1 Gbps Ethernet and fiber hubs routers and switches T...

Страница 18: ...rity If the power requirements for attached devices exceed the total power budget of the switch the PoE power to the device on the highest numbered active PoE port is disabled to make sure that the de...

Страница 19: ...ue network icon represents a router that is connected to an Internet modem In such a setup you must connect one port on the switch to a LAN port on the router Figure 4 Sample PoE business use case Con...

Страница 20: ...that is connected to an Internet modem In such a setup you must connect one port on the switch to a LAN port on the router Figure 5 Sample switch surveilliance and security application Connection Lin...

Страница 21: ...is connected to a computer or file server can provide up to 2 Gbps bidirectional throughput In a small office or home office network the blue network icon represents a router that is connected to an I...

Страница 22: ...in the following sections Step 1 Prepare the Site Step 2 Protect Against Electrostatic Discharge Step 3 Unpack the Switch Step 4 Install the Switch Optional Step 5 Install SFP Transceiver Modules Ste...

Страница 23: ...noise such as radio transmitters broadcast amplifiers power lines and fluorescent lighting fixtures Cabling Temperature Install the switch in a dry area with an ambient temperature between 32 F and 1...

Страница 24: ...following figure shows the package contents Figure 7 Switch package contents Check the contents of the boxes to make sure that all items are present before installing the switch To check the package c...

Страница 25: ...otpads cushion the switch against shock and vibrations They also provide ventilation space between stacked switches Wall Mount the Switch The bottom panel of the switch provides four VESA mount holes...

Страница 26: ...the switch The four mounting holes must be in a square at precise distances of 75 mm 2 953 inches from each other In the following figure each green arrow represents 75 mm 3 Drill holes into the wall...

Страница 27: ...e switch to the wall Wall Mount the Switch Horizontally With the Back Panel Facing Up To mount the switch horizontally to a wall with the back panel facing up that is with the cables at the top 1 Loca...

Страница 28: ...are in the switch package 4 Insert the anchors into the wall and tighten the screws with a No 2 Phillips screwdriver Leave about 6 mm inch of each screw protruded from the wall so that you can insert...

Страница 29: ...e switch The four mounting holes must be in a square at precise distances of 75 mm 2 953 inches from each other In the following figure each green arrow represents 75 mm 3 Drill holes into the wall fo...

Страница 30: ...and mount the switch to the wall Poor Wall Mounting Position To prevent the switch from tilting do not wall mount the switch vertically with the back panel facing right that is with the cables on the...

Страница 31: ...t package through each bracket and into the bracket mounting holes in the switch 3 Tighten the screws with a No 2 Phillips screwdriver to secure each bracket 4 Align the mounting holes in the brackets...

Страница 32: ...h or crossover cables Use a Category 5 Cat 5 Cat 5e or Cat 6 cable that is terminated with an RJ 45 connector Ethernet specifications limit the cable length between the switch and the attached device...

Страница 33: ...the NETGEAR Insight app you can discover the switch on the network and add the switch to the NETGEAR Insight app so that you can perform basic management and monitoring tasks from your smartphone The...

Страница 34: ...oting This chapter provides information about troubleshooting the switch The chapter includes the following sections Troubleshooting Chart PoE Troubleshooting Suggestions Additional Troubleshooting Su...

Страница 35: ...LED and an individual activity LED are off when the port is connected to a device Break the loop by making sure that only one path exists from any networked device to any other networked device After...

Страница 36: ...ermits Additional Troubleshooting Suggestions If the suggestions in the troubleshooting chart do not resolve the problem see the following troubleshooting suggestions Network adapter cards Make sure t...

Отзывы: