![NETGEAR 8X8F Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/netgear/8x8f/8x8f_hardware-installation-manual_1673184047.webp)
3
Installation
This chapter describes the installation procedures for the switch. Switch installation
involves the steps described in the following sections:
•
•
Step 2: Protect against electrostatic discharge
•
•
•
Optional Step 5: Install SFP transceiver modules
•
Optional Step 6: Install a power supply unit
•
Optional Step 7: Connect a redundant power supply to model M4300-52G-POE+
•
Step 8: Check the installation
•
Step 9: Apply AC power and check the LEDs
•
Optional Step 10: Connect a console to the switch
47