iv
List of Figures
2.1. Rubber standoffs placement ............................................................................................ 4
2.2. Front brackets installation ................................................................................................ 5
2.3. Rack installation .............................................................................................................. 6
2.4. Transceivers and cables .................................................................................................. 7
2.5. Removing the fan module ................................................................................................ 9
2.6. Inserting the fan module ................................................................................................ 10
2.7. Removing the PSU module ............................................................................................ 11
2.8. Inserting the PSU module .............................................................................................. 12
3.1. Aurora 710 front view .................................................................................................... 19
3.2. Aurora 710 rear view ..................................................................................................... 20
3.3. Aurora 710 side view ..................................................................................................... 20
Содержание Aurora 710
Страница 1: ...The Aurora 710 switch installation guide ...
Страница 2: ...The Aurora 710 switch installation guide ...
Страница 7: ...2 Chapter 2 Hardware Installation ...
Страница 15: ...Hardware Installation 10 Figure 2 6 Inserting the fan module FAN PS 1 2 3 4 1 2 E E E ...
Страница 27: ...Netberg Aurora 720 switch 22 SONiC ...