ON-SITE PREPARATIONS
Recommended flow meter pulse rate*
Flow rate
m
3
/hr
Flow meter output
l/pulse
Up to 6
1
6-60
10
Flow rate
GPM
Flow meter output
US gal/pulse
Up to 88
1
88-1000
10
*Compatible with Netafim™ NMC controllers. In cases where the NetaJet™ 4G is to be controlled by a
third-party controller, consult Netafim™.
Electrical preparation
Mains connection
CAUTION
Only qualified electricians are permitted to perform electrical installations!
The following components must be provided for the installation:
•
A readily accessible circuit breaker, rated according to the NetaJet™ 4G total rated power, certified as a
branch circuit over current protector compliant with the national code and requirements.
•
Grounding connection: ≤ 10 Ω.
Mains wire size
For all modes that include a dosing booster
For the selection of the wire size - consider the NetaJet™ 4G total rated power:
5 wires: GND, N, L1, L2, L3
Power source required (kW) 3 X 220-277 VAC
3 X 380-480 VAC
Up to 3
≥ 2.5 mm
2
(≤ 13 awg)
≥ 2.5 mm
2
(≤ 13 awg)
3-4
≥ 4 mm
2
(≤ 11 awg)
4-6
≥ 6 mm
2
(≤ 9 awg)
6-8
≥ 10 mm
2
(≤ 7 awg)
≥ 4 mm
2
(≤ 11 awg)
For the BP ST mode
The BP ST mode does not include a dosing booster. The mains feeds the controller only.
3 wires: GND, N, L
Power source required (W)
1 X 100-115 VAC
1 X 200-250 VAC
250
≥ 1.5 mm
2
(≤ 15 awg) ≥ 1.5 mm
2
(≤ 15 awg)