4. INSTALLATION 

WARNING:

 

BE AWARE THAT INSTALLATION OF THIS EQUIPMENT INCLUDES RISK OF 

ELECTRIC SHOCK. NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND 

ENERGIZED WHEN A GROUND FAULT IS INDICATED.   

Parts Included   

In addi

on to the micro inverters, PV modules, racking, and associated hardware, 

you’ll need the BDM-300 installa

on kit. This kit includes the following items:   

 

Protec

ve end cap   

 

Moun

ng Bracket (adapter plate)   

 

AC

 

trunk cable, 30 foot length (op

on) 

Other Parts and T

oo

ls Required   

In addi

on to your PV array and its associated hardware, you will need the 

following parts:   

 

Junc

on box   

 

Sockets, wrenches for moun

ng hardware   

 

Lightning Surge Suppressi

o

n   

Lightning does not actually need to strike the equipment or building where PV 

system is installed to cause damage. O

en, a strike nearby will induce voltage 

spikes in the electrical grid that can damage equipment. BDM-300 has integrated 

surge protec

on, greater than most string inverters. However, if the surge has 

su

cient energy, the protec

on built into the BDM-300 can be exceeded, and 

the equipment can be damaged. 
Since the NEP Limited Warranty does not cover “acts of God” such as lightning 

strikes, and since lightning strikes can occur anywhere, it is best prac

ce to install 

surge protec

on as part of any solar installa

on. Installa

on of surge protec

on 

devices should follow vendor instruc

ons. 

Installa

�o

n Pr

o

cedure 

 

WARNING:

 

DO NOT CONNECT BDM-300 TO THE UTILITY GRID OR ENERGIZE THE AC 

CIRCUIT(S) UNTIL YOU HAVE COMPLETED ALL OF THE INSTALLATION PROCEDURES AS 

DESCRIBED IN THE FOLLOWING SECTIONS.   

 

Installing the BDM-300 Micro inverter System involves several key steps:   
1. Measuring service and installing the AC branch circuit junc

on box.   

WARNING: 

ONLY USE ELECTRICAL SYSTEM COMPONENTS APPROVED FOR WET 

LOCATIONS.   

2. A

aching the BDM-300 Micro inverter to the racking.   

3. Connec

ng the BDM-300 Micro inverter wiring harnesses.   

4. Grounding the system (op

onal)

1

.   

5. Comple

ng the BDM-300 Micro inverter installa

on map and connec

ng the 

PV modules.   

The 

nished system should be similar as in the diagram. Detailed installa

on steps 

are listed in the following sec

on.   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 1 - Install the AC Branch Circuit Junc

�o

n B

o

x   

1. Measure service entrance conductors to con

rm AC service at the site. 

Acceptable ranges are shown in the table below: 

 BDM-300-240A & BDM-300-208A (North America)   

240 Volt AC Single Phase 

208 Volt AC Single Phase 

L1 to L2 

211 to 264 

Vac 

L1 toL2 

183 to 229 

Vac 

BDM-300-AU (Australia and New Zealand)   

L1 to L2 

230 Vac 

 

 

 

1

 

DC circuits of BDM-300 are isolated and insulated from ground. An integrated   

grounding protec

on circuit is included in the micro inverter. 

05

04

Содержание BDM-300-208A

Страница 1: ...52 FAX 81 092 433 3171 China Address No 1 Anhe Rd Tsingtao Export Processing Zone Tsingtao China 266113 TEL 86 532 87963900 FAX 86 532 81100917 Email info northernep com Web h p www northernep com h p www nep japan com h p www micro inverter jp SAA 141618 N136 BDM 300 240A D BDM 300 208A D BDM 300 AU D BDM 300 EU D Installa on and Opera on Manual ...

Страница 2: ...a on Procedure Step 1 Install the AC Branch Circuit Junc on Box Step 2 A ach the BDM 300 to the Racking Step 3 Connect the BDM 300 Wiring Harnesses Step 4 Ground the System Step 5 Complete the connec on map and connect the PV Modules 5 COMMISSIONING 6 OPERATING INSTRUCTIONS 7 TROUBLRSHOOTING MAINTENANCE 8 SPECIFICATION 9 WARRANTY AND PRODUCTION INFORMATION 01 02 02 02 02 02 03 03 04 04 04 04 04 05...

Страница 3: ...ommunity and powered by electricity from solar wind and micro turbines Outside China the company has opera on offices in Chicago U S and Vancouver Canada The technology founders of the company are well known experts in the fields of power electronics automa c control signal processing and communica ons Each of the founders has mul ple U S and world patents in their specialty areas They received Ph D ...

Страница 4: ...INVERTER SHOULD BE MODIFIED ALL INSTALLATION SHOULD FOLLOW THE LOCAL ELECTRIC CODES FURTHER PROTECTION ON THE AC WIRING FROM THE INVERTERS SHOULD BE PROVIDED AND MAY BE REQUIRED BY LOCAL AND NATIONAL WIRING REGULATIONS THIS PROTECTION IS LIKELY TO INCLUDE RESIDUAL CURRENT DEVICES EARTH FAULT MONITORS AND CIRCUIT BREAKERS THIS PRODUCT MAY CAUSE AC CURRENT WITH A DC COMPONENT IF A RESIDUAL CURRENT O...

Страница 5: ...t prac ce to install surge protec on as part of any solar installa on Installa on of surge protec on devices should follow vendor instruc ons Installa on Procedure WARNING DO NOT CONNECT BDM 300 TO THE UTILITY GRID OR ENERGIZE THE AC CIRCUIT S UNTIL YOU HAVE COMPLETED ALL OF THE INSTALLATION PROCEDURES AS DESCRIBED IN THE FOLLOWING SECTIONS Installing the BDM 300 Micro inverter System involves sev...

Страница 6: ... on 2 A ach BDM 300 to the frame BDM 300 can be mounted on the frame of the PV modules Please refer to the manual from the corresponding PC module manufactures that support BDM 300 Step 3 Connect the BDM 300 Wiring Harnesses Each BDM 300 comes with one 3 pin bulkhead receptacle mounted on the case The three pins of this connector are for phases L1 L2 and ground This AC connector is oppositely sexe...

Страница 7: ... map you create Complete the connec on map Each BDM 300 has a removable serial number label located on the moun ng plate Enter this serial number into the BDG 256 and correspond it to a number in the connec on map Connect the PV Modules Completely install all BDM 300 and all system inter wiring connec ons prior to installing the PV modules 1 Mount the PV modules above their corresponding BDM 300 E...

Страница 8: ...ule is applied The status LED will start flashing a er sufficient DC power is applied as an indica on that the BDM 300 is live Status standby The LED light is on by 2 second and off by 2 seconds Red in error Orange no error but not communica ng to BDG 256 Green no error and communica ng to BDG 256 Status producing power The LED light is on by 1 second and off by 1 second Orange not communica ng to BDG ...

Страница 9: ...n in the label of BDM 300 6 Check the DC connec ons between the BDM 300 and the PV module 7 PLC signal quality may be checked through the interface on the BDG 256 gateway If the PLC signal is weak it might be due to the distance between the micro Disconnec ng a BDM 300 from the PV Module To ensure the BDM 300 is not disconnected from the PV modules under load adhere to the following disconnec on s...

Страница 10: ...play LED LIGHT LED LIGHT Communica ons POWERLINE POWERLINE Dimension W H D mm 180 186 25 180 186 25 Weight Kg 1 5 1 5 Per IEEE 1547A MODEL BDM 300 AU D BDM 300 EU D INPUT DC Max Recommended PV Power Wp 340 Vmax PV absolute maximum Vdc 60 PV Input Opera ng Voltage Range Vdc 22 55 Maximum Opera ng PV Input Current Adc 12 MPPT Tracking Accuracy 99 5 Isc PV absolute maximum Adc 28 Maximum Inverter Bac...

Страница 11: ... biological infesta ons or input voltage that creates opera ng condi ons beyond the maximum or minimum limits listed in the NEP product specifica ons including high input voltage from generators and lightning strikes c the product if repairs have been done to it other than by NEP or its authorized service centers herea er ASCs d the product if it is used as a component part of a product expressly w...

Страница 12: ...e Date Fault Message s or Code s Brief Fault Descrip on and Photos Installa on Informa on Modules Used Modules Quan ty Inverters quan ty per string Installa on Company Name Installer Name For the informa on on our warranty terms and condi ons please see our website www northernep com en All fields must be completed in order to process claim Customer Signature Date All rights reserved by NEP This in...

Страница 13: ...12 0011 福岡市博多区博多駅前 3 10 24 藤井ビル 1F TEL 81 092 433 3252 FAX 81 092 433 3171 China Address No 1 Anhe Rd Tsingtao Export Processing Zone Tsingtao China 266113 TEL 86 532 87963900 FAX 86 532 81100917 Email info northernep com Web h p www northernep com h p www nep japan com h p www micro inverter jp ...

Отзывы: