NEP BDM-250-208A Скачать руководство пользователя страница 9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

7. TROUBLESHOOTING AND MAINTENANCE 

WARNING: 

DO NOT ATTEMPT TO REPAIR THE BDM-250; IT CONTAINS NO 

USER-SERVICEABLE PARTS. IF TROUBLESHOOTING METHODS FAIL, PLEASE RETURN THE 

BDM-250 TO YOUR DISTRIBUTOR FOR MAINTENANCE.   

WARNING: 

NEVER DISCONNECT THE DC WIRE CONNECTORS UNDER LOAD. ENSURE THAT 

NO CURRENT IS FLOWING IN THE DC WIRES PRIOR TO DISCONNECTING. AN OPAQUE 

COVERING MAY BE USED TO COVER THE MODULE PRIOR TO DISCONNECTING   

WARNING: 

ALWAYS DISCONNECT AC POWER BEFORE DISCONNECTING PV MODULE WIRES 

FROM BDM-250. THE AC CONNECTOR OF THE FIRST BDM-250 IN A BRANCH CIRCUIT IS 

SUITABLE AS A DISCONNECTING MEANS ONCE THE AC BRANCH CIRCUIT BREAKER IN THE LOAD 

CENTER HAS BEEN OPENED. 

 

WARNING: 

BDM-250 IS POWERED BY DC POWER FROM PV MODULES. MAKE SURE YOU 

DISCONNECT THE DC CONNECTIONS AND RECONNECT DC POWER TO WATCH FOR THE TWO 

SECONDS LED ON AND TWO SECONDS LED OFF AFTER DC IS APPLIED.   

LED indica

�o

o

f err

o

r   

 

Err

o

r rep

o

rt: AC

 o

r DC fault 

 

The LED light is on by 4 second, and o

 by 4 seconds.   

   

 

Err

o

r rep

o

rt: GFDI fault 

 

The LED light stays on.   

Tr

o

ublesh

oo�

ng an in

o

perable BDM-250   

To troubleshoot an inoperable BDM-250, follow the steps in the order shown:   
1. Check the connec

on to the u

lity grid. Verify that the u

�li

ty voltage and 

frequency are within allowable ranges shown in the label of BDM-250.   

2. Verify u

�li

ty power is present at the inverter in ques

on by removing AC, then DC 

power. Never disconnect the DC wires while the BDM-250 is producing power. 

Re-connect the DC module connectors, and then watch for the LED blinks.   

3. Check the AC branch circuit interconnec

on harness between all the BDM-250. 

Verify that each inverter is energized by the u

lity grid as described in the 

previous step.   

4. Make sure that any AC disconnects are func

oning properly and are closed. 

5. Verify the PV module DC voltage is within the allowable range shown in the label 

of BDM-250.   

6. Check the DC connec

ons between the BDM-250 and the PV module. 

7. If the problem persists, please call customer support at NEP.   

WARNING: 

DO NOT ATTEMPT TO REPAIR THE BDM-250; IT CONTAINS NO 

USER-SERVICEABLE PARTS. IF TROUBLESHOOTING METHODS FAIL, PLEASE RETURN THE 

BDM-250 TO YOUR DISTRIBUTOR FOR MAINTENANCE. 

 

   

Disc

o

nnec

ng a BDM-250 fr

o

m the PV M

o

dule   

To ensure the BDM-250 is not disconnected from the PV modules under load, adhere 

to the following disconnec

on steps in the order shown:   

1. Disconnect the AC by opening the branch circuit breaker. 

 

2. Disconnect the 

rst AC connector in the branch circuit.   

3. Cover the module with an opaque cover.   
4. Using a DC current probe, verify there is no current 

owing in the DC wires between 

the PV module and the BDM-250.   

5. Care should be taken when measuring DC currents, most clamp-on meters must be 

zeroed 

rst and tend to dri

 with 

me.   

6. Disconnect the PV module DC wire connectors from the BDM-250.   
7. Remove the BDM-250 from the PV array racking.   

Installing a replacement BDM-250   

1. A

ach the replacement BDM-250 to the PV module racking using hardware 

recommended by your module racking vendor. If you are using grounding washers 

(e.g., WEEB) to ground the chassis of the BDM-250, the old grounding washer should 

be discarded, and a new grounding washer must be used when installing the 

replacement BDM-250. Torque the BDM-250 fasteners to the values listed below: 

1/4” moun

ng hardware – 45 in-lbs minimum   

5/16” moun

ng hardware – 80 in-lbs minimum. 

2. If you are using a grounding electrode conductor to ground the BDM-250 chassis, 

a

ach the grounding electrode conductor to the BDM-250 ground clamp. 

 

3. Connect the AC cable of the replacement BDM-250 and the neighboring BDM-250 

to complete the branch circuit connec

ons.   

4. Complete the connec

on map and connect the PV Modules.   

1) Complete the connec

on map   

2) Each BDM-250 has a removable serial number located on the individual label. 

Enter the unique address contained in part of this serial number into a BDG-256, 

and correspond it to a number in the connec

on map.   

3) Connect the PV Modules   

4) Completely install all BDM-250 and all system inter-wiring connec

ons prior to 

installing the PV modules.   

a) Mount the PV modules above their corresponding BDM-250. Each 

BDM-250 comes with two oppositely sexed DC connectors.   

b) First connect the posi

�v

e DC wire from the PV module to the posi

�v

ely 

marked DC connector (male pin) of the BDM-250. Then connect the nega

�v

DC wire from the PV module to the nega

�v

ely marked DC connector (female 

socket) of the BDM-250. Repeat for all remaining PV modules using one 

BDM-250 for each module.   

 

13

12

Содержание BDM-250-208A

Страница 1: ... 9 Meander Grove Cameron Park NSW2285 China Address No 1 Anhe Rd Tsingtao Export Processing Zone Tsingtao China 266113 TEL 86 532 87963900 FAX 86 532 81100917 SAA 122309 N136 BDM 250 240A BDM 250 AU BDM 250 LV BDM 250 208A BDM 250 EU Installa on and Opera on Manual ...

Страница 2: ...ocedure Step 1 Install the AC Branch Circuit Junc on Box Step 2 A ach the BDM 250 to the Racking Step 3 Connect the BDM 250 Wiring Harnesses Step 4 Ground the System Step 5 Complete the connec on map and connect the PV Modules 5 COMMISSIONING 6 OPERATING INSTRUCTIONS 7 TROUBLRSHOOTING MAINTENANCE 8 SPECIFICATION 9 WARRANTY AND PRODUCTION INFORMATION WARRANTY CARD 01 02 02 02 02 02 03 03 04 04 04 0...

Страница 3: ...ommunity and powered by electricity from solar wind and micro turbines Outside China the company has opera on offices in Chicago U S and Vancouver Canada The technology founders of the company are well known experts in the fields of power electronics automa c control signal processing and communica ons Each of the founders has mul ple U S and world patents in their specialty areas They received Ph D ...

Страница 4: ...STALLATION SHOULD BE DONE BY CERTIFIED ELECTRICIAN BESIDES THE CABLE CONNECTORS NOTHING INSIDE THE INVERTER SHOULD BE MODIFIED ALL INSTALLATION SHOULD FOLLOW THE LOCAL ELECTRIC CODES FURTHER PROTECTION ON THE AC WIRING FROM THE INVERTERS SHOULD BE PROVIDED AND MAY BE REQUIRED BY LOCAL AND NATIONAL WIRING REGULATIONS THIS PROTECTION IS LIKELY TO INCLUDE RESIDUAL CURRENT DEVICES EARTH FAULT MONITORS...

Страница 5: ...rranty does not cover acts of God such as lightning strikes and since lightning strikes can occur anywhere it is best prac ce to install surge protec on as part of any solar installa on Installa on of surge protec on devices should follow vendor instruc ons Installa on Procedure WARNING DO NOT CONNECT BDM 250 TO THE UTILITY GRID OR ENERGIZE THE AC CIRCUIT S UNTIL YOU HAVE COMPLETED ALL OF THE INST...

Страница 6: ...roximately six inches long and are terminated with single pole connectors The AC connectors are oppositely sexed so that mul ple inverters can be connected to form one con nuous AC branch circuit 1 Orient the first BDM 250 in each branch with its male connector facing the junc on box The junc on box AC interconnect cable has a female connector The BDM 250 can be mounted with either side facing up t...

Страница 7: ...area Refer to local regula on for minimum size requirement for ground conductor size Step 5 Complete the connec on map and connect the PV Modules BDM 250 connec on Map is a diagramma c representa on of the physical loca on of each BDM 250 in your PV installa on The virtual array in NEP micro inverter gateway BDG 256 is created from the map you create Complete the connec on map Each BDM 250 has a r...

Страница 8: ...e BDM 250 is powered on when sufficient DC voltage from the module is applied The status LED will start flashing a er sufficient DC power is applied as an indica on that the BDM 250 is live Status standby The LED light is on by 2 second and off by 2 seconds Status producing power The LED light is on by 1 second and off by 1 second Status producing power and communica ng with BDG 256 The LED light is on ...

Страница 9: ...YOUR DISTRIBUTOR FOR MAINTENANCE Disconnec ng a BDM 250 from the PV Module To ensure the BDM 250 is not disconnected from the PV modules under load adhere to the following disconnec on steps in the order shown 1 Disconnect the AC by opening the branch circuit breaker 2 Disconnect the first AC connector in the branch circuit 3 Cover the module with an opaque cover 4 Using a DC current probe verify t...

Страница 10: ...ent to the Array Adc 0 OUTPUT AC Rated AC Output Power W 220 Nominal Power Grid Voltage Vac 230 Current maximum con nuous Aac 1 0 Current inrush Peak and Dura on 12A 15us Nominal Frequency Hz 50 Power Factor cos phi fixed 0 99 Maximum Output Fault Current Aac 2 2A peak Maximum Output Overcurrent Protec on Aac 6 3 Maximum Number of Units Per Branch 15 SYSTEM EFFICIENCY Peak Efficiency 96 30 CEC Efficien...

Страница 11: ...xport Processing Zone Tsingtao China 266113 Phone 86 532 87963900 Fax 86 532 81100917 What does this warranty not cover Claims are limited to repair and replacement or if in NEP s discre on that is not possible reimbursement up to the purchase price paid for the product NEP will be liable to you only for direct damages suffered by you and only up to a maximum amount equal to the purchase price of t...

Страница 12: ...ODUCT AND IS WHERE PERMITTED BY LAW IN LIEU OF ALL OTHER WARRANTIES CONDITIONS GUARANTEES REPRESENTATIONS OBLIGATIONS AND LIABILITIES EXPRESS OR IMPLIED STATUTORY OR OTHERWISE IN CONNECTION WITH THE PRODUCT HOWEVER ARISING WHETHER BY CONTRACT TORT NEGLIGENCE PRINCIPLES OF MANUFACTURER S LIABILITY OPERATION OF LAW CONDUCT STATEMENT OR OTHERWISE INCLUDING WITHOUT RESTRICTION ANY IMPLIED WARRANTY OR ...

Страница 13: ...d 1781 Riverview Ave Tracy CA 95377 Australia Address 9 Meander Grove Cameron Park NSW2285 China Add No 1 Anhe Rd Tsingtao Export Processing Zone Tsingtao China 266113 TEL 86 532 87963900 FAX 86 532 81100917 ...

Отзывы: