Chapter
INSTALLATION
NEOFOLD HS
VERSION:
NF.HS-07-03/2015-GB
5-3
Installation
5.3
Open the box and remove the right shoulder of the stand (
C
), remove one of the two
cross bars (
E
), fix the lower cross bar
(fig. 5.2)
to the shoulder using the screws, the
plate for the cross bar and the bushes supplied
(fig. 5.3)
.
Caution
the shoulder has holes of different sizes, the side with the larger holes must
face outwards.
Remove the left shoulder from the box (
D
) and fix it to the cross bar fixed to the right
shoulder.
Fig. 5.3
Fig. 5.2
Содержание Neofold HS 1250
Страница 1: ...User Manual GB Manuale D uso I ...