A u t h o r :
J . L e v i n e
D a t e :
J a n 1 3 , 2 0 1 4
P a g e
|
3 - 7
A p p r o v e d :
R . H a n s o n
D a t e :
J a n 1 3 , 2 0 1 4
R e v i s i o n :
A - 0 1
Electrical Connections:
FLYING LEAD:
Wiring to be completed by qualified personnel as per applicable standards for area of use.
FIELD WIRED:
1.
Inspect package contents to ensure no damage has occurred during shipping.
2.
Remove ZLM module or assembly from box.
3.
Verify line voltage and frequency conform to product specifications (shown on specification
sheet and certification label.
4.
Remove cast end plate using (10) ten x M4 socket head cap screws (shown).
5.
Feed cable through strain relief or approved alternative. Torque to spec.
6.
Wire according to diagram (shown) (terminations to be made using #6 insulated ring terminals).
7.
Energize fixture.