Nemalux LS Series Скачать руководство пользователя страница 5

STEP 2:

Strip 95mm (3.75in) of cable jacket, and trim back any 

filler. Strip conductor insulation 10mm (0.39in) from 

ends. Feed wire through end cap, rubber gland, and 

gland cap. Install cord clamp and tighten to 20 in-lbs 

(2.3 N-m) so that cable jacket protrudes 5mm past 

the end of the cord clamp.

Slide together end cap, rubber gland, and gland cap 

assembly, before fastening with three M4 socket 

head cap screws torqued to 20 in-lbs (2.3 N-m).

NOTE:

Electrical cord used must be 14 Gauge/3 Conductor 

SOOW with an outer diameter between 13mm [0.51”] 

and 14.2mm [0.56”]. SOOW cord must be rated for 

600V/90˚C or higher.
Maximum string length must not exceed 300 ft.
Maximum number of lighting modules must not exceed 

30 units on a single string.

STEP 3:

Connect each conductor into appropriate connectors

STEP 4:

Wrap excess conductor inside cap and gently rotate to 

compress wires (without pinching them) till the assem-

bly holes align with the core and internal wires are not 

strained or pinched.

Attach End Cap Assembly to the core with the supplied 

M4 socket head cap screws (3) with M4 hex driver 

torque to 2.3 N-m (20 in-lbs).

STEP 5:

Repeat steps 2-4 for other side of module.

INSTALLATION (CONT.)

TM

Nemalux

I N D U S T R I A L

LS Series

rev. A-20

5-6

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

MADE IN CANADA

Step 4

Step 2

  85mm  

  10mm  

  5mm  

Отзывы: