Section 10: Performance Verification
10-6
Calibration Process
If calibration is required, perform the calibration process (after
performing CO
2
Calibration Check) as shown in Table 10-2: "Calibration
Table 10-2: Calibration Process
Objective
Action
Result
To start
calibration
process after
calibration check.
No action
required.
To activate
calibration
process.
long press
Adjust the
display value to
the gas
concentration you
are using.
short press
To start
calibration.
Press the gas
valve and
long press
Continue
pressing the gas
valve until the
message
Disconnect
Gas appears.
Monitor performs
an internal
calculation.
Disconnect gas
from the
FilterLine.
Calibration
succeeded.
No action
required.
Return to
calibration check
mode.
long press
Содержание NPB-75
Страница 3: ...Handheld Capnograph Pulse Oximeter Service Manual 005554B...
Страница 4: ...This page intentionally left blank...
Страница 11: ...This page intentionally left blank...
Страница 13: ...This page intentionally left blank...
Страница 29: ...This page intentionally left blank...
Страница 33: ...This page intentionally left blank...
Страница 49: ...This page intentionally left blank...
Страница 51: ...This page intentionally left blank...
Страница 69: ...This page intentionally left bl ank...
Страница 71: ...This page intentionally left blank...