™
EXPOSED MOUNT INSTALLATION INSTRUCTIONS
Sealant
Apply Silicone Sealant
6. Apply a small bead of silicone sealant
where toilet base meets finish floor.
Wipe and clean any excess sealant immedi-
ately.
7. Connect water supply.
• Connect the shut-off valve to the supply pipe.
Gradually open the valve and check for leaks.
• Flush several times to test for leaks and continue
to do so periodically for the first few days of usage.
MUR
NBKD-40A