Legs model:
Pedestal model:
Top view:
8. TECHNICAL DRAWINGS
Страница 1: ...Nectre MK2 LE Installation Instructions Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email info pecan eng com au Phone 08 8349 8332 Fax 08 8260 6643 ACN 007 741 693...
Страница 2: ...IN BREACH OF THE APPROVAL GRANTED FOR COMPLIANCE WITH AS NZS 4012 AS NZS 4013 CAUTION MIXING OF APPLIANCE OR FLUE SYSTEM COMPONENTS FROM DIFFERENT SOURCES OR MODIFYING THE DIMENSIONAL SPECIFICATION O...
Страница 3: ...this Installation Guide it must be done in accordance with Australian Standard AS NZS 2918 2001 Section 3 Tables 3 1 3 2 Shield Construction The shield shall be constructed from a heat resistant mater...
Страница 4: ...p and bottom of the inner reflector and bend out to create an air gap between it and the outer decro mesh If the draft is insufficient or periodic down drafting occurs and the heater smokes or only bu...
Страница 5: ...ld be in a horizontal orientation 2 Lower baffle plate 490 w x 245 d x 6 h mm Slide the lower baffle plate up and over the lower set of support hooks welded to the top of the firebox Slide the plate b...
Страница 6: ...Legs model Pedestal model Top view 8 TECHNICAL DRAWINGS...