background image

NECTA SPA TECHNICAL MANUAL 

SFERA

 “ 

Manual  

“ SFERA”  

 

 

19 / 

19

 

ANNUAL CLEANING AND HYGIENE 

The “annual” period is intended as maximum term, as such maximum time must be reduced in accordance to the 
specific situation and location of the vending machine to maintain its perfect state of hygiene at all times. 

 

Expected time 20 min. (excluding the pull-down time “

* ”) 

 

 

Open the door and disconnect the machine form the 

power supply (FIG.1 

Remove all trays, placing them in a clean area or in any 
case protected by possible interference (FIG. 2)

 

Clean the inside of the refrigerated box with a damp 
cloth soaked in chlorine-based detergents. 

Completely remove the cooling unit 

 (FIG . 3) thoroughly clean the internal base and 

make hygienic. 

Remove all the dust from the fans and cooling unit 

condenser (FIG. 4 ). 
Clean and make hygienic the condensation tray (FIG. 

4) 

Reassemble the cooling unit proceeding in the reverse 
order. 

Reinsert into the operating position. 

Clean the external parts, especially the coin-return 

compartment and the push-buttons. Reassemble all 
trays after cleaning the internal product loading parts.

Thoroughly clean the inside of the dispensing 

compartment.  

Start the machine and bring the internal temperature 

to operating value. 

Load all vending products. 

Pull-Down: technical term that defines the length of time 

required for bringing the temperature inside the cabinet to 

the correct level

 

 

  

FIG.  1 

FIG. 2 

FIG.  3 

FIG.  4

Содержание Sfera 6-32R / E

Страница 1: ...ECTA SPA TECHNICAL MANUAL SFERA Manual SFERA 1 19 SERVICE MANUAL SFERA BASIC TECHNICAL MANUAL THE CONTENTS OF THIS DOCUMENT ARE INTENDED FOR NECTA S AFTER SALES PERSONNEL AFTER SALES SERVICE Snack Foo...

Страница 2: ...d configuration Vending systems Power supply and Wiring Cooling unit Cabinet and Door Trouble shooting HACCP directive Use instructions Periodical cleaning and hygiene Daily Weekly Yearly Pages 3 4 5...

Страница 3: ...irect for five advertised selections NB2 without such code the machine is supplied with only the 12 button numeric keypad DESCRIPTION VARIABLES TRAYS Up to 6 max HEIGHT 0F TRAYS 96 mm min and up to 21...

Страница 4: ...e code is indicated on the side in any case there are many configurations options with simple and quick change operations Release spirals with different pitches are provided as indicated in the user m...

Страница 5: ...NECTA SPA TECHNICAL MANUAL SFERA Manual SFERA 5 19 Sfera 6 36R B Sfera 6 36R UK Sfera 6 32R E Sfera 6 36R D Version provided for Spain Version provided for Belgium Version provided for Germany...

Страница 6: ...th a 3 x 1 5 mm2 section 1 HO5 VV F 2 HO7 RN F In all configurations the cable is fitted with a SCHUKO plug permanently fixed to the cable NOTE In the event of replacement cables of exactly the same c...

Страница 7: ...Board Payment system connections NTC Probe Cooling unit control J12 RATIOMOTOR CONNECTIONS POWER SUPPLY UNIT CPU CENTRAL PROCESSING UNIT BOARD RS232 PORT PRINTER PROGRAMMER PC Phototransistor card Rec...

Страница 8: ...during the normal operation YELLOW LED It glows when 5 V DC is present in the board RED LED it glows when the software is reset program malfunction Minidip functions 1 4 REF 20 Coin mechanism setting...

Страница 9: ...NECTA SPA TECHNICAL MANUAL SFERA Manual SFERA 9 19 TRAY CONNECTION WIRING DIAGRAM CONNECTOR Detail of spiral control ratiomotor To connector J 12 CPU board 4 5 1 6 3 2...

Страница 10: ...FERA 10 19 POWER SUPPLY AND LIGHTING DIAGRAM 2 1 3 4 5 6 7 Wiring diagram of dispensing compartment slider lock device kit 1 2 Power supply EXE 3 4 Connector J14 24 V DC CPU board power supply 5 6 7 8...

Страница 11: ...o be able to dispense 20 to 76 mm wide products In addition the spirals can be right or left hand to be used in double compartment configuration with double spiral The ratiomotor is fitted with a mini...

Страница 12: ...ile the lamps and the cooling unit are controlled by means of special relay cards at the grid voltage The power supply unit is housed in a removable galvanised steel metal box for greater accessibilit...

Страница 13: ...condenser cooling from the lower part of the base through a filter that removes the dust such filter is accessible and easy to remove for cleaning FIG 2 The cooling air is expelled from the front sid...

Страница 14: ...by means of a single lock located inside the sliding compartment on the right A sliding compartment is located on the front right side with the user interface integrated on its front panel the CPU bo...

Страница 15: ...nge the operating default values The machine will continue working but some parameters could have been changed with consequences to the general functioning the RAM needs to be initialised as soon as p...

Страница 16: ...otected against short circuits with two line fuses one on each phase with fuses on the secondary winding and on CPU board power supply see wiring diagram Check that the fuses are intact and if necessa...

Страница 17: ...hygiene practices After cleaning do not touch the surface of any elements that may come into contact with food Wash your hands thoroughly preferably using disinfectant before starting any hygiene ope...

Страница 18: ...cabinet with a cloth dampened with a chlorine based detergent Check that there are no small insects Open the door and disconnect the machine form the power supply FIG 1 Clean the outside and inside of...

Страница 19: ...ed detergents Completely remove the cooling unit FIG 3 thoroughly clean the internal base and make hygienic Remove all the dust from the fans and cooling unit condenser FIG 4 Clean and make hygienic t...

Отзывы: