NEC Confidential
© NEC Corporation 2009
Page 23
1. Power off the system and disconnect the AC cord from the KSU.
2. Remove the Sub-Cover.
3. Loosen two screws and remove the Main-cover.
4. Insert the CF card (with the new Main software loaded) to the CF slot on PZ-VM21
daughterboard. (PZ-VM21 should be temporary installed if the system does not have it.)
5. Push in and hold the Load button (S1 on the CPU card).
6. Turn the system power on.
7. Continue holding the Load button (S1) for approximately 10 seconds
or until Status LED (D5) starts flashing red.
8. Release the Load button (S1).
9. Wait until the Status LEDs (D2 to D5) on the CPU card has the following indications
(approximately two minutes).
10. Turn the power off and remove the CF card from the CF slot on PZ-VM21.
11. Replace the Main-cover and Sub-cover.
12. Turn the system power back on.
13. When the system has completed reloading the software, the RUN LED is flashing blue.
Software Upgrading
New Main Software will be provided by NEC Infrontia.
Procedure
บริษัท โปรเฟสชั�นแนล พีเอบีเอ็กซ์ จํากัด โทร. 02-519-1718 Hotline. 084-920-5065
Содержание SL1000
Страница 1: ...Technical Training System Installation Next Topaz...
Страница 2: ...Part 1 Hardware Installation...
Страница 14: ...Part 2 System Start Up Programming...
Страница 24: ...NEC Confidential NEC Corporation 2009 Page 24 Software Upgrade 1 02 519 1718 Hotline 084 920 5065...
Страница 39: ......