CHAPTER 2 INSTALLATION
MP Reset
NEAX2000 IVS
2
Remote PIM System Manual
ND-70917 (E), Issue 1.0
Page 55
Figure 2-27 Example of M10 MDF Cross Connection
via CN Connector (Remote Site) (2 of 2)
MP RESET
After mounting all DAI cards/M10 cards and establishing the connection between the Main Site
and the Remote Site, press SW1 switch on the MP card.
1 CN CONNECTOR
17
18
19
20
RA
TA
42
43
44
45
RB
TB
LTC (J)
42
43
44
45
RB
TB
17
18
19
20
RA
TA
(P)
2 LTC1 CONNECTOR
TB
TA
RB
RA
Содержание NEAX2000 IVS2
Страница 1: ...ND 70917 E ISSUE 1 STOCK 151973 Remote PIM System Manual FEBRUARY 2000 NECAmerica Inc...
Страница 24: ...NEAX2000 IVS2 Remote PIM System Manual Page 16 ND 70917 E Issue 1 0 This page is for your notes...
Страница 64: ...NEAX2000 IVS2 Remote PIM System Manual Page 56 ND 70917 E Issue 1 0 This page is for your notes...