56
CHAPTER 2 CONNECTION
2.2 Powering-On/Powering-Off Order
After connection of the emulation probe and target system is completed, turn on the power. The powering-on/
powering-off order is as follows.
Caution Be sure to observe the powering-on/powering-off order. Failing to observe it may destroy the
IE-784000-R.
<Powering-on order>
(1)
Turn on the power of the IE-784000-R.
(2)
Turn on the power of the target system.
<Powering-off order>
(1)
Turn off the power of the target system.
(2)
Turn off the power of the IE-784000-R.
Содержание IE-784915-R-EM1
Страница 2: ...2 MEMO...
Страница 6: ...6 MEMO...
Страница 11: ...VOLUME 1 IE 784915 R EM1 I O EMULATION BOARD 11...
Страница 12: ...12 MEMO...
Страница 18: ...MEMO 18...
Страница 24: ...MEMO 24...
Страница 28: ...28 CHAPTER 3 SETTING OF USER CLOCK MEMO 28...
Страница 30: ...MEMO 30...
Страница 38: ...MEMO 38...
Страница 40: ...MEMO 40...
Страница 41: ...VOLUME 2 EP 784915GF R EMULATION PROBE 41...
Страница 42: ...42 MEMO...
Страница 48: ...MEMO 48...
Страница 58: ...MEMO 58...
Страница 64: ...MEMO 64...