9-60 Upgrading Your Server
[Advanced] menu of the BIOS setup utility, make sure that the [PCI
Slot
xx
ROM] parameter (where
xx
is the PCI slot number) under [PCI
Configuration] is set to [Enabled].
IMPORTANT:
When N8103-129/130 is inserted, do not switch to the
hibernation or standby mode.
1.
See page 9-4 to prepare.
2.
Pull out the server from the rack (as described on page 9-4).
3.
Remove the logic cover (as described on page 9-25).
4.
Hold the riser card handle and bracket as shown in the figure on the right, and remove the
riser card.
If the card is hard to remove, hold down the server while lifting the card.
IMPORTANT:
Carefully remove the riser card so as not to contact
any other components.
5.
Remove the bracket from the server.
Screws
Содержание Express5800/R120b-2
Страница 21: ...Notes on Using Your Server 1 3 3 5 inch disk model ...
Страница 22: ...1 4 Notes on Using Your Server Internal View 2 5 inch disk model ...
Страница 23: ...Notes on Using Your Server 1 5 3 5 inch disk model ...
Страница 241: ...6 10 Installing and Using Utilities 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 245: ...6 14 Installing and Using Utilities Windows Server 2003 ...
Страница 273: ...7 14 Maintenance This page is intentionally left blank ...
Страница 326: ...Troubleshooting 8 53 When you use a remote console 6 Each tool is selected and it starts ...
Страница 428: ...C 2 IRQ This page is intentionally left blank ...
Страница 452: ...D 24 Installing Windows Server 2008 R2 4 Activate Windows The Windows activation is complete ...
Страница 479: ...Installing Windows Server 2008 E 25 4 Activate Windows The Windows activation is complete ...
Страница 484: ......
Страница 540: ......
Страница 542: ...H 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Страница 552: ...I 10 Accessing Power and Performance Data This page is intentionally left blank ...
Страница 556: ...J 4 Product Configuration Record Table This page is intentionally left blank ...