Site Planning Checklist
1-4
Express5800/320Ma: Site Planning Guide
❏
Will your system connect to an EMC
®
CLARiiON
®
AX100
®
storage system? If so,
the system requires one pair of U531 Optical Fibre Channel PCI Adapters, which
are provided when you order the storage system.
❏
Will your system connect to EMC CLARiiON CX or to EMC Symmetrix
®
storage
systems? If so, the system requires one pair of optical fibre channel PCI adapters,
as described in
Table 1-2
.
❏
Will you supply your own monitor
or will NEC Solutions (America), Inc. supply the
monitor?
N O T E
Use the USB keyboard and mouse supplied by NEC
Solutions (America), Inc..
❏
Will the components in a cabinet include a keyboard-video-mouse (KVM) switch?
Planning AC Power
❏
Will you provide power through a power distribution unit (PDU)?
❏
Will you provide power from a UPS?
❏
What are the AC power requirements of your system, including all optional
components?
❏
Is the AC power service wired properly?
❏
What are the lengths and types of the power cords that are provided with your
system? What type of receptacles do you need to provide?
Planning Space for Your System
❏
Will your system and its external components fit where you plan to place them?
Table 1-1. Ethernet PCI Adapters
Adapter
Number of Ports
U575 Dual-Port Copper Gigabit Ethernet Adapter
Table 1-2. Optical Fibre Channel PCI Adapters
Attachment Method
PCI Adapter
Through a Storage Area
Network (SAN) or switch
U525 Optical Fibre Channel PCI Adapter, two of which are
provided in the AK415 Attachment Kit
Directly attached
U526 Optical Fibre Channel PCI Adapter, two of which are
provided in the AK419 Attachment Kit
Содержание Express5800/320Ma
Страница 1: ...NEC Solutions America Inc NR573 Express5800 320Ma Site Planning Guide...
Страница 10: ...Preface x Express5800 320Ma Site Planning Guide...
Страница 18: ...System Documentation 1 8 Express5800 320Ma Site Planning Guide...
Страница 40: ...Connecting a System Directly to a UPS 5 6 Express5800 320Ma Site Planning Guide...
Страница 50: ...Sample PDU Usage Calculation 7 6 Express5800 320Ma Site Planning Guide...
Страница 52: ...System Specifications A 2 Express5800 320Ma Site Planning Guide Figure A 1 Pedestal System Front View asys006a...
Страница 77: ...Standards Compliance Standards Compliance C 3 VCCI Note BSMI Note...
Страница 78: ...Standards Compliance C 4 Express5800 320Ma Site Planning Guide...