![NEC Active Upgrade Express5800/320Fc Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/nec/active-upgrade-express5800-320fc/active-upgrade-express5800-320fc_site-planning-manual_251111023.webp)
Planning for Cables
3-2
Express5800/320
Fc
: Site Planning Guide
Planning for Cables
To accommodate cables from your Express5800/320Fc system, make sure to provide:
•
One telephone line for use when calling for service
•
Ethernet jacks, switches, or hubs, as needed
•
Two electrically separate grounded AC wall outlets, or a UPS and a wall outlet,
within reach of the power cords from the system or PDUs and additional outlets for
any components that do not connect to a PDU
Make sure that cables you plan to connect to the system are long enough to reach
between the system and external components or connections.
Содержание Active Upgrade Express5800/320Fc
Страница 1: ...NEC Corporation of America 456 01723 000 Express5800 320Fc Site Planning Guide ...
Страница 10: ...Preface x Express5800 320Fc Site Planning Guide ...
Страница 17: ...System Documentation 1 7 page intentionally left blank Express5800 320Fc Site Planning Guide ...
Страница 41: ...System Specifications A 2 Express5800 320Fc Site Planning Guide Figure A 1 Pedestal System Front View ...
Страница 59: ...Standards Compliance Standards Compliance C 3 VCCI Note BSMI Note ...
Страница 60: ...Standards Compliance C 4 Express5800 320Fc Site Planning Guide ...