![NEC Active Upgrade Express5800/320Fc Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/nec/active-upgrade-express5800-320fc/active-upgrade-express5800-320fc_site-planning-manual_251111019.webp)
Cabinet Requirements
2-2
Express5800/320
Fc
: Site Planning Guide
•
To prevent stray voltages, all components are grounded together through the
vertical mounting rails to the cabinet frame, and then to local building ground. To
ensure signal quality, use a grounding cable provided by NEC
Corporation of
America
for local building ground.
•
There is a plan for maintaining cables and wires to the cabinet by either running
them under the floor or placing them overhead in an overhead cable tray.
•
Air flows through the cabinet from front to back.
•
Filler panels cover any unused rack space to prevent air recirculation.
•
Vents are evenly distributed on the front and rear doors and comprise at least 63%
of the surface area.
N O T E
If your cabinet does not have vented front and rear doors,
you can remove the doors from the cabinet while your
Express5800/320
Fc
system is
operating.
Figure 2-1
shows the required rail clearance between the front vertical rails and the
inside edge of an accessory leg.
Содержание Active Upgrade Express5800/320Fc
Страница 1: ...NEC Corporation of America 456 01723 000 Express5800 320Fc Site Planning Guide ...
Страница 10: ...Preface x Express5800 320Fc Site Planning Guide ...
Страница 17: ...System Documentation 1 7 page intentionally left blank Express5800 320Fc Site Planning Guide ...
Страница 41: ...System Specifications A 2 Express5800 320Fc Site Planning Guide Figure A 1 Pedestal System Front View ...
Страница 59: ...Standards Compliance Standards Compliance C 3 VCCI Note BSMI Note ...
Страница 60: ...Standards Compliance C 4 Express5800 320Fc Site Planning Guide ...