![NCR XL15 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/ncr/xl15/xl15_site-preparation-manual_3774868024.webp)
16
Site Preparation
Electrical Requirements
Power is supplied to the display either from an external power supply or through a
Powered USB interface. In either case, the nominal input voltage shall be +12 volts and
conform to the following.
Parameter
Minimum
Typical
Maximum
Input V10.8 V
+12.0 V
+13.2 V
Power Consumption
Display
Typical
Standby
No Touch
5.70 W
2.18 W
Resistive
5.89 W
2.57 W
PCAP
5.84 W
2.33 W
AC Store Wiring Requirements
The customer must provide suitable AC power for the terminals, associated equipment,
and devices. We recommend a dedicated unswitched power line dedicated to the NCR
equipment installation. Refer to the
NCR Workstation and Peripherals AC Wiring Guide
(BSTO-2115-53) for store AC wiring requirements. The AC outlet must be installed near
the terminal and easily accessible to the operator.
Содержание XL15
Страница 1: ...Site Preparation Guide NCR XL15 5915 BCC5 0000 5163 Issue E...
Страница 14: ...6 Site Preparation With Enhanced Keypad with MSR F147 F247 With Enhanced Keypad with JIS MSR F148 F248...
Страница 15: ...Site Preparation 7 With Enhanced Keypad with No MSR Filler Plate F149 F249...
Страница 16: ...8 Site Preparation With XL Series Stand 5915 F033 F233 XL Series Stand 5915 F033 F233 Tilt Angle 17 to 112...
Страница 19: ...Site Preparation 11 With Checkstand Mount 5968 K039 Checkstand Mount 5968 K039 Tilt Angle 0 to 48...
Страница 20: ...12 Site Preparation With Wall Mount 7702 K320 With Quick Release Bracket 5915 K320...
Страница 21: ...Site Preparation 13 With VESA Bracket Adapter Plate 5915 K330 K331 XL Series Stand Dimensions...
Страница 22: ...14 Site Preparation Pole 5915 K400 Dimensions...
Страница 26: ...18...